Supporting Documentation · Nov 10, 2024
West Orange Township_Fourth Round HEFSP_Final Draft
b08496f4f272779955d0f204f9d1dc52e9651894e9ab0504d4cadf48113086aeIndexed text · page 188
Show all pagesto route as much traffic as possible onto Warmer Road, to the extent permitted by RSIS (to be discussed and designed as the construction of the Proposed Development progresses); 8. Bayowski Drive shall remain a cul-de-sac, but may provide emergency access to the Subject Property; 9, Emergency access to the Subject Property shall be via Howell Drive and Bayowski Drive, to the extent required by the Township and/or Planning Board. If permitted by RSIS or if WEHI obtains a waiver (see No. 6, above), then Kuzik Drive shall also serve as emergency access to the Subject Property, All emergency access points shall include physical barriers to deter and prevent non-emergency access; 10. WEHI to install speed bumps/traffic calming devices and/or signage on Association lands where necessary (to be discussed and designed as the construction of the Proposed Development progresses); 11. WEHI to install landscaping, buffering and speed calming measures/devices along Warner Road and Kuzik Drive within Association lands in connection with transforming Warmer Road into a “boulevard” (to be discussed and designed as the construction of the Proposed Development progresses); 12, The construction of the Proposed Development will not result in any loss of parking on Association lands; 13. Before the commencement of construction of the Proposed Development, and within thirty (30) days following nonappealable site plan and related municipal land use approvals for the Proposed Development, WEHI will pave the portion of Oval Road from Oval Road’s intersection with Eagle Rock Avenue to Oval Road’s intersection with Warner Road; 14. Contemporaneously with the commencement of the paving of the first portion of the final course of roadway paving within the Proposed Development, WEHI shall restore and repave the following Association roads (the “Shared Roads”); Oval Road from Eagle Rock Avenue to Warner Road; Warner Road; Kuzik Drive; Reger Lane; a portion of Lapis Circle (southeast quadrant connecting Reger Lane to the northeast segment of Lapis Circle and continuing to its intersection with Kuzik Drive) and Bayowski Drive; 15. Warner Road shall be the only road utilized by WEHI in connection with the construction of the Proposed Development. WEHI shall in good faith limit construction traffic and employ dust control/street cleaning measures, as necessary. WEHI shall not
WEHI in connection with the construction of the Proposed Development. WEHI shall in good faith limit construction traffic and employ dust control/street cleaning measures, as necessary. WEHI shall not permit construction deliveries on Saturday, Sunday or holidays. No construction parking/idling shall take place within or near Association property; 16. WEHI shall provide the Association with at least 2-weeks’ notice of any road closures or utility interruption;
File revisions (1)
- Sep 29, 2026
b08496f4f27222,997,109 bytes