Supporting Documentation · Nov 10, 2024
West Orange Township_Fourth Round HEFSP_Final Draft
b08496f4f272779955d0f204f9d1dc52e9651894e9ab0504d4cadf48113086aeIndexed text · page 305
Show all pagessuccessors or assigns construct or attempt to construct any improvement in conflict with or in violation of the terms of this approval, the Board hereby reserves the right to withdraw, amend or supplant the instant approval. 4. All construction, use and development of the property shall be in conformance with the plans approved herein, all representations of the Applicant and its witnesses during the public hearing, all exhibits introduced by the Applicant, and all terms and conditions of this resolution. 5. The Applicant shall pay all outstanding taxes, tax liens, application fees and technical review fees, as well as any inspection fees that may be required hereunder. The Applicant shall pay any additional fees or escrow deposits which may be due and owing within thirty (30) days of notification or this approval shall be deemed withdrawn. 6. All notes included in the approved plans, including notes required by this Resolution, shall be deemed conditions of approval having the same force and effect as conditions expressly set forth in this Resolution. 7. Applicant shall list all conditions of approval onto final site plan submission, 8. Applicant shall obtain all necessary approvals pertaining to water and sewer utilities and soil conservation districts. 9. Applicant shall comply with all recommendations found in the 4/29/21 letter of the Board's Engineer, excepting the differences that were addressed at the public hearing with respect to Sections 22 and 23; specifically, that landscaped screening shall not be provided on the west side of the building, and that mulch will be provided in lieu of the ground cover identified in section 23. 10. Applicant shall provide for an additional Electric Vehicle Charging station if necessary and appropriate. 11. Applicant shall comply with all comments and recommendations with the Planning Director's Memorandum dated April 29, 2021. 12. Applicant shall lower the height of the outdoor lighting fixtures to seven (7) feet. 13. Applicant shall work in good faith with the Township in order to supply a handicap parking spot on Tompkins Street. 14. Applicant shall comply with all commitments made in its sustainability checklist submission. 15. Applicant shall work with the Township to supply a street address for the project and thereafter provide a street address sign in accordance with the Township's
stainability checklist submission. 15. Applicant shall work with the Township to supply a street address for the project and thereafter provide a street address sign in accordance with the Township's Ordinances. 16. Applicant shall provide a rain barrel for watering on site.
File revisions (1)
- Sep 29, 2026
b08496f4f27222,997,109 bytes