Supporting Documentation · Nov 10, 2024
West Orange Township_Fourth Round HEFSP_Final Draft
b08496f4f272779955d0f204f9d1dc52e9651894e9ab0504d4cadf48113086aeIndexed text · page 383
Show all pagesconsidered questions and comments from Board members and from the public as shall appear in the Board’s minutes for the meetings of June 3, 2020 and June 25, 2020; and considered the following documents submitted by the Applicant: JBMISSION: ITEM SIGNED BY DATE/REVISION Site Plan (29 sheets) Zachary E. Chaplin, P.E. 5/7/20 Tree Location Survey (2 sheets) Philip A. McEntee, Jr., P.L.S. 4/22/20 Landscaping Plan (2 sheets) Zachary E. Chaplin, P.E. 4/29/20 Tree Removal Plan (1 sheet) Zachary E. Chaplin, P.E. 4/29/20 Truck Turn Exhibit (5 sheets) Jeffery A. Martell, P.E. 4/28/20 Sustainability Memorandum Zachary E. Chaplin, P.E. 5/8/20 Architectural Plans (22 sheets) Minno Wasko Architects and Planners 3/19/20 Traffic Engineering Evaluation Eric L. Keller, P.E., P.P., LEED AP 3/19/20 Stormwater Management Report — Zachary E. Chaplin, P.E. 5/7/20 Report of Geotechnical Investigation Nejm E. Jundi, P.E. 12/31/19 EXHIBITS PRESENTED BEFORE THE BOARD NUMBER DESCRIPTION A-1 AERIAL EXHIBIT A-2 STONEFIELD 5/27/20 REPORT A-3 COLORED SITE PLAN A-4 EXISTING CONDITIONS PLAN A-21 COVER SHEET A-22 SECOND FLOOR PLAN, BUILDING A A-24 PACKAGE CENTER PHOTO A-30 FLOOR PLANS-BUILDINGS B/C A-31 ELEVATIONS—BUILDING B A-32 ELEVATIONS—BUILDING C
File revisions (1)
- Sep 29, 2026
b08496f4f27222,997,109 bytes