250701_42 ERW_Stormwater Report
bdfa016c460e03ce05ddc52cb7067d249c3e5525d506e2c3c9ddb7fc5338dbc9Indexed text · page 5
Show all pagesStormwater Quantity 1.1 Stormwater Management As mentioned above, a subsurface infiltration basin has been designed to provide water quantity mitigation for the runoff discharging to the existing drainage channel. Initial geotechnical investigations on the site found bedrock in the area of the proposed basin at an approximate elevation of 613.00, and investigations on the neighboring property at 40 Eagle Ridge Way found infiltration rates of 6 in/hr. As the site is located in within the same soil type as 40 Eagle Ridge Way, it is anticipated that the site will have similar infiltration rates. The Geotechnical Data Report for 40 Eagle Ridge Way is included as an appendix to this report. Further soil testing to confirm the infiltration rate will be performed prior to construction. Full HydroCAD output calculations are provided in the appendix. The results are summarized in the table below. 1.2 Summary Table Description A. Existing Conditions Design Point 1 Required Reductions (50%, 75%, 80%) Design Point 2 Required Reductions (50%, 75%, 80%) B. Proposed Conditions Design Point 1 Design Point 2 2 Year Storm 10 Year Storm 100 Year Storm 2.85 cfs 1.43 cfs 0.55 cfs 0.28 cfs 5.99 cfs 4.49 cfs 1.19 cfs 0.89 cfs 12.64 cfs 10.11 cfs 2.54 cfs 2.03 cfs 1.22 cfs 0.26 cfs 3.96 cfs 0.55 cfs 10.10 cfs 1.14 cfs According to §25-29.4.r of the Township of West Orange, stormwater management measures shall be designed so that the post-construction peak runoff rates for the 2-, 10-, and 100-year storm events are 50%, 75%, and 80%, respectively, of the preconstruction peak runoff rates. As can be seen in the Summary Table above, the post-construction peak runoff rates for the 2-, 10-, and 100-year storm events have been reduced below the required peak runoff rates. 1.3 Stormwater Management Facility Operations and Maintenance The long-term operations and maintenance of the proposed stormwater management facilities shall be performed in accordance with the Stormwater Management Facility Operations & Maintenance Manual, which will be prepared prior to construction. This Manual will explain how often maintenance should be performed and how long it should take for the proposed on-site stormwater management systems to drain to ensure proper operation. Stormwater Management Report | October 18, 2024 – Revised July 1, 2025 Page 3
File revisions (1)
- Sep 29, 2026
bdfa016c460e15,878,530 bytes