Supporting Documentation · Sep 4, 2025
250701_42 ERW_Stormwater Report
bdfa016c460e03ce05ddc52cb7067d249c3e5525d506e2c3c9ddb7fc5338dbc9Indexed text · page 7
Show all pagesConclusion As discussed above, water quantity mitigation is provided for all watersheds for all storm events studied in accordance with NJDEP and Township of West Orange regulations. A subsurface infiltration basin was utilized to achieve the required reductions for all Design Points. Furthermore, water quality treatment is not required for this project site. As such, there should be no adverse impacts due to stormwater, on-site or off-site, as a result of the proposed development. Included in the appendix of this report is the HydroCAD output for back-up on both the existing and proposed conditions. Additionally, the aforementioned Existing and Proposed Drainage Area Maps, an Inlet Area Map and a Pipe Capacity Report are provided in the appendix of this report. Stormwater Management Report | October 18, 2024 – Revised July 1, 2025 Page 5
File revisions (1)
- Sep 29, 2026
bdfa016c460e15,878,530 bytes