Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

O28 Litwornia West Essex Highlands Traffic Report 82225 FINAL

Preserved file SHA-2561dff6f53c70e15a841d46a0d3ec32415c7cce4489ef672a06f4f3123ac001751

Indexed text · page 23

Show all pages
Page 23

Page 23 Index: Page Topic 1 Background 1 RSIS Defined 2 Cul-de-sac 4 Site Map 5 Road and sidewalk grade issues 6 Dwg SP-47 and SP-29 issues 7 Site map with ADT new and existing 8 Site Parking Analysis 9 De-minimis RSIS Section 5:21-3.1 Exceptions Discussed 10 Eagle Rock Ave – Issues 11 Intersection of Oval Road and Eagle Rock Ave 12 A Left Turn Lan on Eagle Rock Ave at Oval Road, Traffic Calming, Emergency Access, Street Widths 13 Road Slopes, Construction Circulation Plan, Emergency access, road widths 14 Air Quality in Garages, Sight Triangles, Street Classification, Conclusions 15 Conclusions 1, 2, 3, 4, 5, 6, 7 16 Attachments: Appendix A Appendix B List of Application Deficiencies 1 thru 20 ADA Accessible Route reference SP-44 Warner Road Plan and Slope SP-45 Building A Plan and Profile SP-46 Kuzik Drive Plan and Profile A SP-47 Kuzik Drive Plan and Profile B SP-48 Conceptual Bridge Crossing SP-49 Road D Plan and Profile D Tax Map with new roads depicted from Eagle Rock Ave

File revisions (1)