Supporting Documentation · Oct 16, 2025
25 10 16 Memorandum Engineering rcd 10 17 2025
5cb509b7c9c7eb47b097dcae38b6f8ea0ca0001547a522644cc94ebe6dddaf0eIndexed text · page 4
Show all pagesConsulting & Municipal ENGINEERS "ASSOCIATES Chairman and Members of the West Orange Township Zoning Board October 16, 2025 Re: MPB Realty, LLC (ZB-22-13) Our File No. VWRZ0153.01 (60002) Preliminary & Final Major Site Plan and Conditional Use Permit Page 4 with ‘C’ & ‘D' Variances and Tree Removal Permit - Review #4 C. STORMWATER MANAGEMENT COMMENTS 1. The Stormwater Management Operation and Maintenance Manual and any future revisions must be recorded upon the deed of record for the property. Prior to recording, the form of the deed must be approved by the Board Attorney and our office. D. TRAFFIC COMMENTS 1. The Site Plan (sheet 5) has been revised to include a sign indicating that the parking stall directly north of the drive-thru exit will be a “pull ahead” drive-thru parking space. Therefore, a detail of this sign should be added to the plans. The Applicant should address the Board regarding their plans to provide a loading space as required by §25-12.3 of the Ordinance. Sheet 21 includes a vehicle circulation plan for a WB-50 tractor trailer. The plan shows that the truck will only access the front of the site. The Applicant should address the Board on how deliveries will be made to each restaurant without obstructing circulation at the site, including access to the handicap parking spaces. E. LANDSCAPING AND FORESTRY COMMENTS 1. As stipulated in Section 25-12.1(0) and Section 28-4e.8., the Applicant must provide shade trees to create 50% shade for the parking areas within twenty-five (25) years; whereas it does not appear that the proposed landscaping will comply. F. LIGHTING COMMENTS 1. In accordance with Section 25-14.3 of the Ordinance, a minimum of 2.0 footcandles is required for parking areas whereas the applicant has proposed a minimum of 0.6 footcandles. The Applicant is requesting a waiver for this requirement. Staff notes that the proposed lighting meets IES (illuminating Engineering Society) standards. Provide the manufacturer's catalog cuts for proposed light poles and provide full ordering information for all light fixtures and poles to prevent confusion during construction. The Applicant is hereby advised that any revised plans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made
lans or other documents submitted to the Board should be accompanied by a cover letter which addresses each of the comments in this review letter and also details any other changes that have been made to the plans as these may not be readily apparent. 'S.\West Orange\Zoning BoardiVWR: MPB Realty, LLC\25-10-16 MPB Realty - Review No. 4.docx
File revisions (1)
- Sep 29, 2026
5cb509b7c9c7272,494 bytes