Supporting Documentation · Dec 18, 2025
25 09 15 Memorandum
da2734e6b062796d99019eadfb0fa737c7cd5be1fd10d81b02f06fce1bb61704Indexed text · page 2
Show all pagesConsulting & Municipal ENGINEERS ATES Chairman and Members of the West Orange Township Zoning Board September 15, 2025 Re: Montclair Stables, LLC (ZB-25-02) Our File No. 115.WRZ0152.V06 Preliminary & Final Site Plan with ‘C’ Page 2 and ‘D’ Variances, Soil Removal Permit and Tree Removal Permit - Review #2 A Steep Slopes Disturbance Report prepared by Robert M. Cunningham, PE dated August 26, 2025. A copy of a September 5, 2025 memorandum from John Olivo, PLA with Bosenberg Landscape Architecture of Far Hills, New Jersey to the West Orange Zoning Board of Adjustment which addresses the comments in our April 3, 2025 review memorandum. A copy of a September 5, 2025 letter from Joesph Wenzel, Esq. with Friend & Wenzel of Clifton, New Jersey to the West Orange Zoning Board of Adjustment which addresses the comments the Site Plan Review Advisory Board report dated June 17, 2025. A copy of a September 5, 2025 letter from Thomas Ricci, Jr., PP and Marcella Traina, PP with Stonefield Engineering and Design, LLC of Rutherford, New Jersey to the West Orange Zoning Board of Adjustment which addresses comment #15 in the Site Plan Review Advisory Board report dated June 17, 2025. A set of catalog cuts from LSI Industries Inc. for the proposed light fixtures. A copy of a Verification of Taxes & Sewer Charges Paid from the Office of the Tax Collector dated September 2, 2025 which states that the taxes on lot 176, block 152.02 are paid until October 31, 2025. In addition, it states that the 2025 sewer charges have been paid in full. A copy of a Verification of Taxes & Sewer Charges Paid from the Office of the Tax Collector dated September 2, 2025 which states that the taxes on lot 179, block 152.02 are paid until October 31, 2025. In addition, it further states that there is no sewer on this lot. A copy of a Verification of Taxes & Sewer Charges Paid from the Office of the Tax Collector dated September 2, 2025 which states that the taxes on lot 186, block 152.02 are paid until October 31, 2025. In addition, it states that the 2025 sewer charges have been paid in full. In addition to the above, our office previously received the following information as part of the original submission for this application: A set of Tree Removal and Landscape Plans (3 sheets) prepared by John Olivo, LLA with Bosenberg Landscape Architecture dated December 27, 2024. A set of
the original submission for this application: A set of Tree Removal and Landscape Plans (3 sheets) prepared by John Olivo, LLA with Bosenberg Landscape Architecture dated December 27, 2024. A set of unsigned Boundary & Topographic Survey drawings (2 sheets) prepared by Wayne Ingram, PLS with French and Parrello Associates of Hackettstown, New Jersey dated August 2, 2023. A Planning Report prepared by Matthew J. Seckler, PE, PP, PTOE, Thomas Ricci, Jr., PP and Marcella Traina, PP with Stonefield Engineering and Design, LLC dated February 5, 2025. A completed Application Form. ‘S:\West OrangelZoning Board\115 WRZ0152 VO6 - Montclair Stables, LLC\25-09-15 Review #2. docx
File revisions (1)
- Sep 29, 2026
da2734e6b062453,809 bytes