Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 16, 2025

25 10 20 MPB Realty Planning Review 4

Preserved file SHA-2565407334756b2b23c21f6bb388ebdda60818b78145ac11b0afb775def1e268cb4

Indexed text · page 5

Show all pages
Page 5

West Orange Zoning Board October 20, 2025 Re: MPB Realty (Popeyes & IHOP) Our File No. WRZ0153.V01 Planning Review #4 Page 5 S:\West Orange\Zoning Board\VWRZ0153.01 - MPB Realty, LLC\25-10-16 MPB Realty - Planning Review 4.docx 4. Materials Submitted The following materials have been submitted and reviewed in association with this application: • Application form and submission checklists dated July 1, 2024; • Two (2) page application cover letter from Jason Tuvel, Esq. dated August 12, 2024; • Twenty-one (21) sheet set of site plan drawings prepared by Dynamic Engineering, dated June 7, 2024, last revised August 22, 2025; • Two (2) sheet set of architectural drawings prepared by G 141 Architecture, dated June 12, 2024; • Acoustical Evaluation report, prepared by Lewis S. Goodfriend & Associates, dated June 17, 2024, revised February 3, 2025; • Drainage statement for subject property, prepared by Dynamic Engineering, dated June 2024; • Environmental Impact Statement, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Stormwater Management Operation and Maintenance Manual, prepared by Dynamic Engineering, dated June 2024; • Traffic Impact Study, prepared by Dynamic Traffic, dated October 21, 2022, last revised June 4, 2024; • Variance & Waiver Request List, prepared by Dynamic Engineering, dated June 7, 2024; • Planning Report and Justification for Variances, prepared by Dresdner Robin, dated August 2, 2024, revised to September 5, 2025; • Tree Removal Report, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Solid Waste Management Plan, prepared by Dynamic Engineering, dated June 7, 2024; • Copy of Resolution PB-97-18, dated October 8, 1997; • Copy of Resolution dismissing previous application without prejudice, dated March 21, 2024; • One (1) sheet survey drawing prepared by Dynamic Survey, LLC, dated May 13, 2021 • Eight (8) page response letter prepared by Dynamic Engineering, dated September 8, 2025; • One (1) sheet sustainability checklist report; • One (1) page Rooftop Mechanical and Equipment Acoustical response letter prepared by Lewis S. Goodfriend & Associates, dated October 8th, 2025.

File revisions (1)