Supporting Documentation · May 28, 2026
Geotechnical Engineering Report 12 10 2024 submission
1c1a06e906baf7819137bbabdc0c5687d4ca7f932871028f567f77adf5570ff2Indexed text
(ML) SILT, trace gravel, light brown, tan, 10 7.4 moist, loose 11-32-50/3" S-2 SS 15 13 (ML) SILT, reddish brown, moist, (82/9") 82/9" medium dense to very dense 11-15-15-15 5 S-3 SS 24 19 610 (30) 7.3 30 11-12-13-10 S-4 SS 24 17 (25) 25 13-13-50/5" S-5
13-13-50/5" S-5 SS 17 11 (63/11") 63/11 9.9 " 10 605 AUGER REFUSAL AT 11.0 FT 15 600 20 595 25 590 30 585 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered) Dry BORING STARTED: Nov 22 2024 CAVE IN DEPTH: WL (Comple on)
Dry BORING STARTED: Nov 22 2024 CAVE IN DEPTH: WL (Comple on) Dry BORING Nov 22 2024 HAMMER TYPE: Auto WL (Seasonal High Water) COMPLETED: EQUIPMENT: LOGGED BY: WL (Stabilized) DRILLING METHOD: Hollow Stem Auger Diedrich D-50 LJK1 GEOTECHNICAL BOREHOLE LOG
CLIENT: PROJECT NO.: BORING NO.: SHEET: Mavis Tire Supply, LLC 44:2100 B-05 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: Mavis #2296 - West Orange, NJ Sano Drilling SITE LOCATION: LOSS OF CIRCULATION 460 Prospect Avenue, West Orange, New Jersey, 07054 LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION: BOTTOM OF CASING 40.791445 -74.254028 620.0 STANDARD PENETRATION BLOWS/FT (TCP/MC/SPT-N value)* LIQUID LIMIT
LIQUID LIMIT PLASTIC LIMIT SAMPLE NUMBER 10 20 30 40 50 SAMPLE DIST. (IN) ELEVATION (FT) RECOVERY (IN) WATER LEVELS 20 40 60 80 100 SAMPLE TYPE DEPTH (FT) ROCK QUALITY DESIGNATION & RECOVERY BLOWS/6" CALIBRATED PENETROMETER RQD TSF
RQD TSF DESCRIPTION OF MATERIAL REC 1 2 3 4 5 MC SAMPLER BLOWS/FT WATER CONTENT % [FINES CONTENT] % 10 20 30 40 50 10 20 30 40 50 TEXAS CONE PENETRATION BLOWS/FT Topsoil Thickness[3.00"] 2-1-3-4 S-1 SS 24 12 (4) (ML/CL) CLAYEY SILT, brown to dark 4
(ML/CL) CLAYEY SILT, brown to dark 4 brown, reddish brown, moist, rm 2-3-3-5 S-2 SS 24 13 (6) 12.5 6 (SM) SILTY SAND, reddish brown, moist, 7-12-22-24 5 S-3 SS 24 16 dense 615 (34) 34 (ML/CL) CLAYEY SILT, reddish brown, 10-9-10-12 S-4 SS 24 17 brown, moist, very s to very hard (19) 13.2 19 12-12-14-11 S-5 SS 24 12
12-12-14-11 S-5 SS 24 12 (26) 26 10 610 S-6 SS 4 4 50/4" (50/4") 50/4" 15 END OF BORING AT 15.0 FT 605 20 600 25 595 30 590 THE STRATIFICATION LINES REPRESENT THE APPROXIMATE BOUNDARY LINES BETWEEN SOIL TYPES. IN-SITU THE TRANSITION MAY BE GRADUAL WL (First Encountered) Dry BORING STARTED: Nov 22 2024 CAVE IN DEPTH: WL (Comple on) Dry BORING
Dry BORING Nov 22 2024 HAMMER TYPE: Auto WL (Seasonal High Water) COMPLETED: EQUIPMENT: LOGGED BY: WL (Stabilized) DRILLING METHOD: Hollow Stem Auger Diedrich D-50 LJK1 GEOTECHNICAL BOREHOLE LOG
CLIENT: PROJECT NO.: BORING NO.: SHEET: Mavis Tire Supply, LLC 44:2100 B-06 1 of 1 PROJECT NAME: DRILLER/CONTRACTOR: Mavis #2296 - West Orange, NJ Sano Drilling SITE LOCATION: LOSS OF CIRCULATION 460 Prospect Avenue, West Orange, New Jersey, 07054 LATITUDE: LONGITUDE: STATION: SURFACE ELEVATION: BOTTOM OF CASING 40.791368 -74.253944 619.0 STANDARD PENETRATION BLOWS/FT (TCP/MC/SPT-N value)* LIQUID LIMIT
File revisions (1)
- Sep 29, 2026
1c1a06e906ba5,593,597 bytes