Supporting Documentation · May 28, 2026
Completed Sustainability Checklist submission
f4bec32afa9ef54e0f3d107ca933bbb03aa8e1fef69ad615822a8e08600940fbIndexed text
Joshua Lilley, LEEP AP BD + C (however project will not be LEED certified) All light fixtures interior and exterior to be LED. Light fixtures in private rooms and storage will be on occupancy sensors with timers. Restroom fixtures are water sense labeled products. There are two small appliances: microwave and under-counter refrigerator. N/A Provided by General Contractor Please refer to the Landscape Plan (Sheet 8 of 20) and the Landscape Notes and Details (Sheet 9 of 20) of the Preliminary and Final Site Plan. The Landscape Plan proposes native, hardy species which are common for this proposed use and location. N/A Roof membrane will be TPO with a min. SRI value of 0.78 Not applicable. This project does not result in greater than 1 acre of disturbance or create ¼ acre or more of new regulated impervious or motor vehicle surface, and therefore, the project is not subject to the stormwater management quantity, quality and recharge requirements set forth at NJAC 7:8. Please refer to the Landscape Planting Schedule located in the Landscape Plan (Sheet 8 of 20) the Preliminary and Final Site Plan. The following plants have been proposed on site: Shade Trees, Ornamental Trees, Evergreen Trees, Evergreen Shrubs, Deciduous Shrubs and Ground Cover.
File revisions (1)
- Sep 29, 2026
f4bec32afa9e286,050 bytes