25 10 23 Mavis Tire Planning Review 1

Preserved file SHA-256f12acb2bd9e5662857c83252fbabd8368b06e20a23b3097d3a45a42e83e07d39

Indexed text

Page 9

West Orange Zoning Board October 23, 2025 Re: Mavis Tire Supply, LLC Our File No. 115.WRZ0105.V01 Planning Review #1 Page 9 S:\West Orange\Zoning Board\115.WRZ0105.V01 - Mavis Tire Supply, LLC\25-10-20 Mavis Tire- Planning Review 1.docx If you have any questions about this report, please do not hesitate to reach out to our office. Sincerely, CME Associates Christopher N. Dochney – PP, AICP Program Manager Board Planner CD cc: Geniece Gary-Adams – Township Zoning Official Zayibeth Carballo, PE, PLS, PP – Township Engineer Steven Warner, Esq. – Board Attorney Alex Fisher, Esq. – Board Attorney John Hess, PE, PP, CME – Board Engineer Ryan MacNeill, PE – Board Engineer Mavis Tire Supply, LLC - Applicant Lisa A. John-Basta, Esq. – Applicant’s Attorney Rodman R. Ritchie, PE – Applicant’s Engineer Christine A. Nazzaro-Cofone, AICP, PP – Applicant’s Planner

Page 10

West Orange Zoning Board October 23, 2025 Re: Mavis Tire Supply, LLC Our File No. 115.WRZ0105.V01 Planning Review #1 Page 10 S:\West Orange\Zoning Board\115.WRZ0105.V01 - Mavis Tire Supply, LLC\25-10-20 Mavis Tire- Planning Review 1.docx 7. Materials Submitted The following materials have been submitted and reviewed in association with this application: • A set of Preliminary and Final Site Plan drawings (20 sheets) prepared Rodman R. Ritchie, PE and Marla A. Roller, LLA with Dynamic Engineering of Marlton, New Jersey dated July 16, 2025. • A set of unsigned architectural plans (2 sheets) prepared by Larson Design Group, Inc. of Cranberry Township, Pennsylvania, June 30, 2025. • A print of an ALTA/NSPE Land Title Survey (1 sheet) prepared by James A. Conway Jr., PLS with Dynamic Survey, LLC of Newark, New Jersey and bearing a latest revision date of December 17, 2024. • A Drainage Statement prepared by Rodman R. Ritchie, PE, PP dated July 2025. Included with the Drainage Statement is a set of Drainage Area Maps (2 sheets) prepared by Dynamic Engineering dated July 16, 2025. • A Geotechnical Engineering Report prepared by Stephen F. Patt, PE and Jeffrey C. Yates, PE with ECS Mid-Atlantic, LLC of Moorestown, New Jersey dated December 10, 2024. • Addendum No. 1 – Results of Test Pit Excavation and Infiltration Testing prepared by Jeffrey C. Yates, PE and Stephen F. Patt, PE dated January 29, 2025. • A Traffic Impact Study prepared by Patrick Downey, PE, PTOE and Justin Taylor, PE, PTOE with Dynamic Traffic of Newtown, Pennsylvania dated July 21, 2025. • A Consulting Report prepared by Christine A. Nazzaro-Cofone, PP with Cofone Consulting Group of Red Bank, New Jersey dated July 22, 2025. • A completed Application Form dated July 16, 2025. • A completed Application for Tree Removal & Replacement Permit dated August 11, 2025. • A completed Site Plan/Subdivision Checklist. • A completed Sustainability Checklist Form. • A Preliminary List of Variances & Waivers prepared by Dynamic Engineering dated July 2025. • Copies of the following Zoning Board of Adjustment Resolutions of Approval for the property in question: o Zoning Board of Adjustment Case No. ZB 84-21 dated January 17, 1985. o Zoning Board of Adjustment Case No. ZB 84-21 dated February 14, 1985. o Zoning Board of Adjustment Case No. ZB 02-27 dated October 17, 2002.

File revisions (1)