Supporting Documentation · Nov 5, 2024
M_PB ESSEX COUNTY TB ZOO Hoofstock Barn
64fb2a50cdfa2158e9148605149acf307ed8f943a0e54f0f299d6bf8b6fd508dIndexed text · page 3
Show all pagesAN EQUAL OPPORTUNITY EMPLOYER www.westorange.org 3 control ordinance (SCO) which exceeds the 5,000 S.F. threshold for a Major Development under Chapter 25, Section 29 that was adopted in May 2025. It is unclear in the conceptual site plan submitted if the Applicant proposes to manage the increase in surface runoff due to the increase in impervious coverage and if any green infrastructure (GI) is to be provided as required by the Township’s SCO. The concept plan shows a dashed area labeled as underground detention and two areas shown with stone hatching labeled storm drainage basin and pipes showing connection to the same stone areas with manholes, headwall, and flared end section. However, it needs to be clarified if it is existing or proposed. These features might satisfy stormwater runoff quantity and quality requirements but are not considered GI, nor are accepted stormwater management systems to address groundwater recharge. The Applicant’s Engineer should provide testimony and clarify how the Township’s SCO requirements are to be addressed for green infrastructure, runoff quantity, runoff quality and groundwater recharge including the overall limit of disturbance for the proposed improvements. ZC/jrm
File revisions (1)
- Sep 29, 2026
64fb2a50cdfa455,357 bytes