Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 5, 2024

23 1345 015 PB 25 03 9 Schindler Terrace Engineering Review June 23 2025

Preserved file SHA-2566a7b44fcd24bd29c10ad92b86308e4e985855fcdda533cb063d9f20cc87259d9

Indexed text · page 2

Show all pages
Page 2

23-1345-015 – PB-25-03 (Kantor - 9 Schindler Terrace) Page 2 of 2 and construct a new one of approximately 10.25 feet in depth or 5.25 feet more than the existing one. The R-C zone requires a 50-foot set back from the property line. The setback with the expanded deck will only be 46.25 feet, but it will align with another expanded deck at 1 Schindler Terrace. Both 1 and 9 Schindler Terrace are located in the first building on the westerly side of Schindler Terrace as one proceeds into the development from Herbert Terrace. 1. General 1.1. Since 9 Schindler Terrace is part of the Normandie Estates Townhouse Association, the Association needs to consent to this application. 1.2. Architectural drawings were not provided as part of the submission materials for the new deck. A rendering or a photo with the new deck superimposed shall be submitted. The existing deck is located at the rear of the first level of the townhouse with the brick patio below at grade or ground level. 1.3. The current Assessment Maps shall be used for the Area Map on Sheet 1. The subdivision to the north is not depicted. 2. Drainage 2.1. The proposed deck addition does not trigger any of the requirements of the Township’s storm water management regulations. The ground disturbance is de minimis and no additional impervious area is created. 3. Soil Erosion & Sediment Control 3.1. No Soil Erosion or Sediment Control Plan is required for this project. We thank you for the opportunity to be of service to the Township of West Orange Planning Board. Please feel free to contact me directly with any questions or comments at (973) 295-3279 or via e-mail at pscott@mnwe.com. Sincerely, MATRIX NEW WORLD ENGINEERING Phillip Scott, P.E., C.M.E. Director of Urban Engineering and Development LL:PS Enclosures Cc: Dennis Petrocelli, PG – Vice President, Matrix F:\2023\23-1345 West Orange 2024 Municipal Engineering Services\015 - PB-25-03 Kantor - 9 Schindler Terrace\23-1345-015 - PB-25-03 - 9 Schindler Terrace - Engineering Review, June 23, 2025.docx

File revisions (1)