Supporting Documentation · Dec 3, 2025
Sustainability Checklist Form_76 Ashland West Orange NJ_062425 f
37dcf02c5cab618d516e8ce9319724373d016c491092d9ee7ea3b76b3f78d345Indexed text
N/A. The building is existing.N/A. The building is existing.The (2) plants selected are native and well adapted species to this climate, so minimum watering is needed.N/A. Building is existing and utilities (electricity, gas, water) are existing.N/A. Building's roof and canopy are existing to remain.N/A. Stormwater system is existing to remain.Minimum landscaping is proposed, but native plants and well adapted species are being use: 1. Red Osier Dogwood (cornus sericia) which is native of north america, 2. Ruby Spider Daylily (Hemerocallis x "Ruby' Spider') which is well adapted to New Jersey and a plant that can survive many harsh conditions.Gianfranco C. Sarrido - LEEP AP BD+CIn Proposed lockers: Water-efficient toilets (1.28 gpf), faucets (max. of 1.5 gpm), shower heads (2.0 gpm). In breakroom and janitor closets: water efficiency faucets (max. of 1.5 gpm). LED lights in support/administrative and circulation areas only.
File revisions (1)
- Sep 29, 2026
37dcf02c5cab78,902 bytes