Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 3, 2025

PB 25 04 76 Ashland Avenue Engineering Review

Preserved file SHA-25664a4ae5a34f691ea497e0fe9633486310d1bee11c370b94cf971a462cebbeec5

Indexed text · page 1

Show all pages
Page 1

Matrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike Florham Park, NJ 07932 973.240.1800 F: 973.240.1818 www.mnwe.com 23-1345-016 – PB25-04 (Blue Violet Grow – 76 Ashland Avenue) Page 1 of 4 August 22, 2025 Via E-mail (jvite@westorange.org) Planning Board Township of West Orange 66 Main Street West Orange, New Jersey 07052 Attn.: Jamilet Baquerizo Vite – Planning Board Secretary RE: ENGINEERING REVIEW FOR BLUE VIOLET GROW, LLC WEST ORANGE PLANNING BOARD APPLICATION No. PB 25-04 CANNABIS CULTIVATION AND MANUFACTURING FACILITY CONDITIONAL USE APPROVAL AND MINOR SITE PLAN APPROVAL 76 ASHLAND AVENUE (BLOCK 62, LOT 22.01) TOWNSHIP OF WEST ORANGE, ESSEX COUNTY, NEW JERSEY MATRIX No. 23-1345-16 Ms. Vite, As requested, Matrix New World Engineering, Land Surveying and Landscape Architecture, PC (Matrix) has reviewed the Planning Board application and supporting documentation for the above-referenced site. Matrix has prepared a technical engineering review of the proposed improvements at the subject. It shall be noted that our review of the project is limited to site / civil engineering only. Matrix defers all planning matters, including but not limited to, bulk and/or use variances, conformance with the master plan and ordinances, etc. to the Board’s Planner. As provided by your office, Matrix has received and reviewed the following documents for this project: • Township of West Orange Application Form for Planning Board or Zoning Board of Adjustment, dated May 21, 2025 including Engineering Site Plan and Architectural Plans: • Site Plan Checklist; • Minor Site Plan, Landscape and Lighting Plan; prepared by Joseph Golden, P.E., dated April 30, 2025; • Lighting Plan; prepared by Joseph Golden, P.E., dated April 30, 2025; • Sustainability Checklist Form; • Yerrr Canna Resolution of Approval, PB-24-05; • Cannabis Cultivation and Manufacturing Facility Building Renovation; prepared by Gianfranco Sarrido, R.A., dated April 30, 2025;

File revisions (1)