Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 3, 2025

Checklist MSP 2025 06 30 DSig

Preserved file SHA-25602cd821ee0a0f0e6365478d3bd0ef47f99c2f59dbbcc622e46f795c8cc723984

Indexed text · page 3

Show all pages
Page 3

ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY LICENSED PROFESSIONAL. Item Number Description Pre-Application - Concept Plan Major Application Minor Application General Subdivision Site Plan Subdivision Site Plan Development Plan Preliminary | Final Preliminary Final LATINO ALATANOONI qasanoza YEAIVA, 23. Item: List of required regulatory approvals or permits, Comment: Basie planning information, ¢ 24, Item: List of variances required or requested. € Comment; Basic planning information, <\< 25, tem: Requested or obtained design waivers or exceptions, Comment; Describes location of all adjacent strictures; not necessary at pre-application-concept plan stages; required a site plan stages; required at site plan only if notice is required by ordinance. < 26, Jtem: Payment of application fees. Comment: Fee not imposed for pre-application conference, < 27, Item: Property owners and lines of all parcels Within 200" identified on most recent tax map sheet Comment: Describes location of all adjacent structures; not necessary at pre-application-concept plan stages; required at site plan only if notice is required by ordinance, 28, Hem: All existing street, water courses, flood plains, wetlands or other enyisonmemually sensitive sireus on and within 200' of site, Comment: while detailed specification of environmentally sensitive areas may not be necessary at pre-application-concept plan and GIP stages, general specification of and sensitivity 10 such conditions is an important planning, consideration, 29, Jtem: Existing right-of-way and/or easements on und within 200° of tract, Comment: Rights-of-way and easements are often unknown xt the pre-application-concept (see however, item 28), < 30, Hem: Topographical features of subject property from U.3.G.S. map. Comment: More detailed topographic information is needed for major subdivision,

File revisions (1)