Supporting Documentation · Nov 10, 2024
O30 Princeton Hydro Report Dated 9 3 25
Preserved file SHA-256
1a9b2fa522d1e444fee5ff74fec0302c0cd7b24b7f38f19def1df89562f314e5Indexed text · page 21
Show all pagesWest Essex Highlands Review West Orange, NJ Permit No. 722-04-0001.1 LUP230001 April 2025 ———BASIN-2- OUTLET STRUCTURE #2 SCALE NTS ANISMED GRADE: 546.5 2s Paks Se AF 56 1s BS, Led 545.62 R ra / 545.18 10 ¥R sus TPs 544.96 2.R 544 2 544.5 BASIN 6” SANO LAYER SOL REPLACEMENT PERMEBILITY = 8 IN/HR INFILTRATION BASIN #2 SECTION ‘SCALE NTS Figure 6 Cross section of BMP 2 from the construction plans. The red lines mark the surface elevation of the nearby wetland. Figure 7 Plan view of BMP 2 from the construction plans. The red lines show the relationship of adjacent wetland to BMP. Princeton Hydro, LLC Page | 17
File revisions (1)
- Sep 29, 2026
1a9b2fa522d125,778,512 bytes