Supporting Documentation · Nov 10, 2024
Draft_October 2025_West Orange_HEFSP_with Appendices
8cc4336a49563e60aff1fbef6e7a71a52d9114761e55ff472121fb6c568c7b40Indexed text · page 369
Show all pages(e) The income mix for the Affordable Units shall be in conformity with the COAH Regulations, UHAC and all other Applicable Laws. (f) The units with rents set for low, very low and moderate income households shall be distributed among each bedroom size on a prorated basis. (g) The Redeveloper may phase construction of the Project and therefore phase construction of the Affordable Units. At a minimum, fifteen percent (15%) of all units in any phase shall be Affordable Units which shall be confirmed by the Township prior to application by Redeveloper for a final certificate of occupancy for any such phase of the Project. 4.3 Construction and Conveyance of Public Dog Park. Redeveloper shall acquire the property identified in Exhibit A and shall construct a public dog park thereon. The public dog park improvements shall be determined by the Township in consultation with the Redeveloper prior to commencement of the Public Dog Park by the Redeveloper (the “Public Dog Park”). After completion of construction, the Township shall inspect and approve said improvements. 4.4 Construction of Library Improvements. If the Township determines to enter into an agreement with Redeveloper for construction of the Library Improvements, Redeveloper shall obtain a right of entry, license and/or agreement with WOOEP to access Lot 41.02 as described in Exhibit B and shall construct a new public library within the existing building in accordance with the specifications to be provided by the Township to the Redeveloper prior to commencement of construction of the library improvements (the “Library Improvements”). The Township shall be responsible for funding the entire cost of the Library Improvements and One Million Five Hundred Thousand Dollars ($1,500,000.00) of the cost of construction of the Library Improvements shall be funded by the RAB. 4.5 Phasing & Project Schedule. The Redevelopment Project may be constructed in Phases in accordance with the schedule attached hereto as Exhibit D (the “Project Schedule”). Redeveloper’s unexcused failure to adhere to the Project Schedule (as the same may be adjusted from time to time with the consent of the Township as hereinafter provided) shall constitute a Default. 4.6 Infrastructure Improvements. Redeveloper shall construct infrastructure improvements as specifically detailed in Exhibit C (the “Infrastructure Improvements”)
provided) shall constitute a Default. 4.6 Infrastructure Improvements. Redeveloper shall construct infrastructure improvements as specifically detailed in Exhibit C (the “Infrastructure Improvements”) at Redeveloper’s sole cost and expense in accordance with the Project Schedule. 4.7 Governmental Approvals. (a) The Redeveloper represents that it will cause to be prepared and filed, at Redeveloper’s sole cost and expense, all Governmental Applications as may be necessary and appropriate for the purpose of obtaining all Governmental Approvals required to implement the Project consistent with the Project Schedule. All of the Governmental Applications shall be in conformity with the applicable provisions of the Redevelopment Plan, this Redevelopment Agreement and Applicable Laws. Redeveloper shall provide the Township with a copy of each Governmental Application at the same time those applications are submitted to the governmental agency having jurisdiction over the same. 19 4839-2360-2911, v. 3
File revisions (1)
- Sep 29, 2026
8cc4336a495627,510,325 bytes