Supporting Documentation · Nov 10, 2024
Draft_October 2025_West Orange_HEFSP_with Appendices
8cc4336a49563e60aff1fbef6e7a71a52d9114761e55ff472121fb6c568c7b40Indexed text · page 422
Show all pagesconsidered questions and comments from Board members and from the public as shall appear in the Board’s minutes for the meetings of June 3, 2020 and June 25, 2020; and considered the following documents submitted by the Applicant: SUBMIS IN! ITEM SIGNED BY DATE/REVISION Site Plan (29 sheets) Zachary E. Chaplin, P.E. 5/7/20 Tree Location Survey (2 sheets) Philip A. McEntee, Jr., P.L.S. 4/22/20 Landscaping Plan (2 sheets) Zachary E. Chaplin, P.E. 4/29/20 Tree Removal Plan (1 sheet) Zachary E. Chaplin, P.E. 4/29/20 Truck Turn Exhibit (5 sheets) Jeffery A. Martell, P.E. 4/28/20 Sustainability Memorandum Zachary E. Chaplin, P.E. 5/8/20 Architectural Plans (22 sheets) Minno Wasko Architects and Planners 3/19/20 Traffic Engineering Evaluation Eric L. Keller, P.E., P.P., LEED AP 3/19/20 Stormwater Management Report — Zachary E. Chaplin, P.E. $/7/20 Report of Geotechnical Investigation Nejm E. Jundi, P.E. 1N31/19 EXHIBITS PRESENTED BEFORE THE BOARD NUMBER DESCRIPTION A-1 AERIAL EXHIBIT A-2 STONEFIELD 5/27/20 REPORT A-3 COLORED SITE PLAN A-4 EXISTING CONDITIONS PLAN A-21 COVER SHEET A-22 SECOND FLOOR PLAN, BUILDING A A-24 PACKAGE CENTER PHOTO A-30 FLOOR PLANS-BUILDINGS B/C A-31 ELEVATIONS—BUILDING B A-32 ELEVATIONS—BUILDING C
File revisions (1)
- Sep 29, 2026
8cc4336a495627,510,325 bytes