Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 10, 2024

Draft_October 2025_West Orange_HEFSP_with Appendices

Preserved file SHA-2568cc4336a49563e60aff1fbef6e7a71a52d9114761e55ff472121fb6c568c7b40

Indexed text · page 445

Show all pages
Page 445

A-4 Fire truck turning analysis dated 2/15/19; A-S Garbage truck turning analysis dated 2/15/19; A-6 Drawing 5 of Landscape Plan, revision date 2/19/19; A-7 Shade study dated 12/15/19; A-8 Sheet A-4, Primrose School exterior elevations dated 11/15/18; A-9 Sheet A-1.4, Primrose School floor plans dated 11/15/18; A-10 Relocated Child care study 6/7/19; A-12 Material Board A-13 Artistic renderings (A-D); A-13-E Artistic Rendering; A-14 List of Projects completed by Harold Maltz, P.E.; A-18 Modified Site Plan dated A-19 8 pages of new architectural plans dated 9/4/19; A-20 Artist’s rendering, view F, dated 9/13/19; A-22 aerial photographs prepared by Mr. Abramson; WHEREAS, the Board considered the reports of Board Engineer, John Hess, PE, PP, CME, dated April 1, 2019, August 13, 2019 and September 13, 2019 and his testimony at the hearing on June 27, 2019 as well as the reports of Township Planner, Paul Grygiel dated March 6, 2019, August 12, 2019 and September 16, 2019. and his testimony at the hearing on June 27, 2019; and WHEREAS, the Board Members questioned the witnesses; and WHEREAS, the following persons questioned the Applicant’s witnesses:

File revisions (1)