Supporting Documentation · Nov 10, 2024
Draft_October 2025_West Orange_HEFSP_with Appendices
8cc4336a49563e60aff1fbef6e7a71a52d9114761e55ff472121fb6c568c7b40Indexed text · page 464
Show all pages25. 26. 27. 28. be positioned closer to the front of the building with a sound insulation partition wall to minimize sound to the rear neighbors. A mechanical lift for ADA accessibility will be provided in front of the building from the parking lot. The proposed parking lot originally provided 22 standard parking spaces but was changed at the request of the Board to remove one space to allow for safer turning egress, one ADA space and two EV spaces (where one was originally proposed), therefore, 25 parking spaces are provided on site. The Board Engineer, Phillip Scott, P.E., C.M.E. pointed out that the proposed ADA parking space would not have the required slope and therefore Applicant agreed to a condition that the parking lot would be re-graded to provide the required slope for the ADA parking space. Applicant requested the following waivers from the Township Site Plan/Subdivision Checklist Items: 9 (certification blocks), 10 (monumentation), 11 (date of current survey), 13 (metes and bounds description), 14 (acreage), 18 (Location and dimensions of any existing or proposed streets), 20 (Copy and/or delineation of any existing or proposed deed restrictions), 23 (List of required regulatory approvals or permits), 30 (Topographical features of subject property from USGS map), 31 (Existing and proposed contour intervals based on U.G.S. & G.S. datum), 36 (Proposed utility infrastructure plans, including sanitary sewer, water, storm water management, telephone, electric and cable TV), 39 (Spot and finish elevations at all property corners), 40 (Construction details as required by Ordinance), 49 (Vehicular and
File revisions (1)
- Sep 29, 2026
8cc4336a495627,510,325 bytes