Supporting Documentation · Nov 10, 2024
Draft_October 2025_West Orange_HEFSP_with Appendices
8cc4336a49563e60aff1fbef6e7a71a52d9114761e55ff472121fb6c568c7b40Indexed text · page 465
Show all pagespedestrian circulation patterns), and 52 (Plans and legal documents for compliance with West Orange COAH). 29. Applicant’s request for waivers of checklist Items 9 through 11 are not applicable because there is no subdivision associated with the application and 18, 23, 30, and 31, have either been satisfied by the Applicant or are not applicable as per the reports of Phillip Scott, P.E.,C.M.E. dated April 1, 2025 and Gerard Haizel, P.P. dated April 2, 2025. 30. | The Application requires the following variance relief from the Board: SECTION/REQUIREMENT | PERMITTED/REQUIRED | PROPOSED 25.7.1 Maximum Building 2.5 Stories/35-feet 3-Stories/34.5-feet Height/Stories 25- 7.1 Minimum Rear Yard 30-feet 6.8-feet (Existing Non- Setback Conforming) 25-7.1 Maximum Lot 75% 87.2% (Existing Non- Coverage Conforming Condition) 31. _N.J.S.A. 40:55D-46a. and b. and N.J.S.A. 40:55D-50a. govern the Board’s review of the preliminary and final site plan application. N.J.S.A. 40:55D-46a provides that an “ordinance requiring site plan review and approval shall require the developer submit to the administrative officer a site plan and such other information as is reasonably necessary to make an informed decision as to whether the requirements necessary for preliminary site plan approval have been met.” N.J.S.A. 40:55D-46a further provides that “The site plan and any engineering documents to be submitted shall be required in tentative form for discussion purposes for preliminary approval. If any architectural plans are required to be submitted for site plan approval, the preliminary plans and
File revisions (1)
- Sep 29, 2026
8cc4336a495627,510,325 bytes