Supporting Documentation · Jan 7, 2026
06 Previous PB and ZBA Decisions
9651059517d0d394a4515fb9fea2cb00cb2242e8436b598451656ab99a8b209cIndexed text · page 24
Show all pages1 under Resolution/.F-99-01. F. Applicant has since filed a new application for the same location seeking to demolish the 2 story house and garage in the rear located on Lot 8.04 and to replace it with 2 stores to be made part ofthe Metropolitan Plant Exchange Strip Mall . It was noted that the new application is different in many respects from the application that was denied and the differences were noted as follows: 1. A drainage plan has been submitted providing for the installation of a "dry well" in the parking lot. 2. A bridge inspection has been performed which includes core testing and load rating and notjust a visual test as before. 3. The present application contemplates either retail and/or professional office space for the two new offices but has no specific tenant. 4. A traffic engineer will do a professional traffic survey which was not done previously. 5. The new free standing building previously was 3,600 square feet and has been reduced to 3,240 square feet, being 60 feet wide by 54 feet deep . 6. The easterly side yard will be increased by 4 feet and the sidewalk will be increased to 8 feet. 7. Further changes include eliminating both the sidewalk at the rear of the building and the retaining wall and eliminating the rear door and substituting a ground sign for its free standing sign. Page 5 RESPONSE TO OPRA 2023-1028_000439
File revisions (1)
- Sep 29, 2026
9651059517d01,954,537 bytes