Supporting Documentation · Jan 7, 2026
06 Previous PB and ZBA Decisions
9651059517d0d394a4515fb9fea2cb00cb2242e8436b598451656ab99a8b209cIndexed text · page 30
Show all pagesWHEREAS,the matter was presented by Robert Williams, Esq., as attorney for the Applicant; and WHEREAS,the Applicant submitted an Area Map,Title Survey,Topo and Existing Conditions, General Site Building,Proposed New Building Area ,Site Plan Detail , Grading and Drainage and Construction Details all prepared by and signed by Michael Lanzafarna and H.Keller, Licensed Engineers and Land Surveyors; and each dated April 10,2000; Landscape Plan prepared and signed by Brian S.Conway,Engineer; dated November 12,1998; Floor Plans,Elevations and Sign Detail prepared and signed by Harold Glucksman,Licensed Architect of New Jersey and dated February 22,2000 and revised June 22,2000 and Engineering Report and Drainage Plan prepared and signed by Gary W.Szelc, Professional Engineer, dated April 14,2000 and Traffic Impact Study prepared and signed by Harvey Yesowitz,Licensed Profesional Engineer and dated August,2000,and report of Christopher P.Statile, Professional Engineer regarding the bridge on the premises dated June 19,2000 and revised August 10,2000; and WHEREAS,various witnesses were presented on behalf of the Applicant in support of their case who included Gary Szelc, Professional Engineer,licensed in New Jersey who prepared the site plan and explained the various exhibits and pointed out the need for the various "C" variances needed and explained the parking situation and the basis for the variance sought and for the sign which will be an identification sign only; and Harold D.Glucksman ,Licensed Architect ofthe State of New Jersey who explained the plans that were submitted and explained how the revised plans show a reduction in size of the building that will be built to replace the house that will be demolished showing it to be 3,240 square feet instead of 3,600 square feet as Page 2
File revisions (1)
- Sep 29, 2026
9651059517d01,954,537 bytes