Supporting Documentation · Jan 7, 2026
06 Previous PB and ZBA Decisions
9651059517d0d394a4515fb9fea2cb00cb2242e8436b598451656ab99a8b209cIndexed text · page 38
Show all pagesWest Orange shall be performed which includes the following: A. The existing bridge on Lot 10 shall be implemented in accordance with the recommendations of Charles Statile, Engineer,to include a new 3 beam guardrail, repair the damage to existing pipe rail and chain link fence, repair the existing electrical service conduit and replacement of the concrete parapet at the northwest corner ofthe bridge. B. The rip-rap channel protection along both abutment footings needs to be constructed to prevent further scouring at the footings. C. A stream encroachment permit shall be obtained if required from the New Jersey Department of Environmental Protection for the construction ofthe rip-rap channel protection. D. Water that still ponds at the bridge shall be corrected so as to remove the same. E. Signs shall be posted on the property and on Pleasant Valley Way advising motorists ofthe weight restrictions on the bridge indicating signs that shall read "no trucks on bridge" with addition oftwo advance warning load posting signs and directional arrows on Pleasant Valley Way to be approved by the Township of West Orange and the County of Essex. F. The bridge shall be inspected annually and report of same submitted to the Engineering Department ofthe Township of West Orange annually. G. Such further plans with respect to the maintenance of the bridge as above stated shall be submitted to the Engineering Department for approval. H. The Applicant's engineers shall submit to the Engineering Department ofthe Page 10
File revisions (1)
- Sep 29, 2026
9651059517d01,954,537 bytes