Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 7, 2026

11 Site Plan and Vairance Submission Checklists

Preserved file SHA-256f4e2357810a289a5e66dbe42ef7808134e190fa126ca1a0d13a7b9bbf8a4da7f

Indexed text · page 1

Show all pages
Page 1

Site Plan/Subdivision Checklist TOWNSHIP OF WEST ORANGE APPLICANT: Trader J oe's East, Inc. ALL DOCUMENTS MUST BE PREPARED, SIGNED AND SEALED BY NEW JERSEY Major Application Q 2 LICENSED PROFESSIONAL, S 8 Be . 5 z es Pre-Application ~ 5 5 Be Concept Plan Minor Application General Site Plan g & ae a 4 3 Development i Item Number _ Descript Subdivision | Site Plan Plan Preliminary Preliminary | Final I-PLAT INFORMATION 1. [tem: Name, address of owner and applicant. x x x Xen x x x license number, seal and auiress of engineer, land surveyor, archer, professional planner, and/or landscape architect, as x applicable, involved In preparation of plat. x x x x x x 3, Wem: ‘Tile block denoting type of application, tax imap sheet, county, nume of municipality, block & lot, x and street location, x x x x x x 4. tem: A key map at specified scale showing location . ~ of tract with reference to surrounding properties, streets, ‘municipat boundaries, etc, with x Comment: Describes setting; may be Jess detaited in pre-application-concept plan and GDP stages. x ¥ x x x x 5, lieu A schedule of required and provided zone district(s) requirentents including lot arsa, widih, depth, yard setbacks, building coverage, open space, parking, x a. Comment: Schedule may be less detailed in pre- application-concept plan stages, x x x x x 6. Jteny: North arrow and scale, x x x x x x 7. Mem: Proof that taxes are current, x x x x ignature bleeks for Chairman, Secretary and x x x x x * x o*: 10, Item: Monumentation as specified by Map Filing Law Comment: Monumentation required only for final N/A subdivision. 11, Meu: Date of eusrent property survey, Requuited by Map Filing Law for final x subdivision and site plan; necessary for vesting on GDP, x x x x x

File revisions (1)