Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 7, 2026

22 O and M Manual NJA23013900 August 2025

Preserved file SHA-256e54c2899fd0b2361542bcad010b53f8c13a6a339ec5affdd9217483cbb5bdc05

Indexed text · page 15

Show all pages
Page 15

MAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES NAME OF FACILITY LOCATION CREW EQUIPMENT WEATHER DATE WORK STARTED WORK COMPLETED TOTAL MANPOWER OF WORK B. CORRECTIVE MAINTENANCE WORK ITEMS ITEMS REQUIRED ITEMS DONE COMMENTS AND SPECIAL INSTRUCTIONS 1. REMOVAL OF DEBRIS AND SEDIMENT 2. STRUCTURAL REPAIRS 3. EMBANKMENTS AND SIDE SLOPES 4. DEWATERING 5. BASIN MAINTENANCE 6. CONTROL OF MOSQUITOES 7. EROSION REPAIR 8. FENCE REPAIR 9. SNOW AND ICE REMOVAL 10. OTHER C. AESTHETIC MAINTENANCE WORK ITEMS ITEMS REQUIRED (X) 1. GRAFFITI REMOVAL 2. GRASS TRIMMING 3. WEEDING 4. OTHERS REMARKS (REFER TO ITEM NO. IF APPLICABLE) WORK ORDER PREPARED BY: ITEMS DONE (X) LOCATION AND COMMENTS

File revisions (1)