Supporting Documentation · Jan 7, 2026
22 O and M Manual NJA23013900 August 2025
e54c2899fd0b2361542bcad010b53f8c13a6a339ec5affdd9217483cbb5bdc05Indexed text · page 15
Show all pagesMAINTENANCE WORK ORDER AND CHECKLIST FOR STORMWATER MANAGEMENT FACILITIES NAME OF FACILITY LOCATION CREW EQUIPMENT WEATHER DATE WORK STARTED WORK COMPLETED TOTAL MANPOWER OF WORK B. CORRECTIVE MAINTENANCE WORK ITEMS ITEMS REQUIRED ITEMS DONE COMMENTS AND SPECIAL INSTRUCTIONS 1. REMOVAL OF DEBRIS AND SEDIMENT 2. STRUCTURAL REPAIRS 3. EMBANKMENTS AND SIDE SLOPES 4. DEWATERING 5. BASIN MAINTENANCE 6. CONTROL OF MOSQUITOES 7. EROSION REPAIR 8. FENCE REPAIR 9. SNOW AND ICE REMOVAL 10. OTHER C. AESTHETIC MAINTENANCE WORK ITEMS ITEMS REQUIRED (X) 1. GRAFFITI REMOVAL 2. GRASS TRIMMING 3. WEEDING 4. OTHERS REMARKS (REFER TO ITEM NO. IF APPLICABLE) WORK ORDER PREPARED BY: ITEMS DONE (X) LOCATION AND COMMENTS
File revisions (1)
- Sep 29, 2026
e54c2899fd0b651,370 bytes