Supporting Documentation · Jan 7, 2026
22 O and M Manual NJA23013900 August 2025
e54c2899fd0b2361542bcad010b53f8c13a6a339ec5affdd9217483cbb5bdc05Indexed text · page 9
Show all pagesThe trees surrounding the pervious pavement system area shall be maintained regularly to ensure good health and exhibit an attractive appearance. Their maintenance should include fertilization twice annually, with one application in the spring and another in early fall. The trees shall be pruned in the late winter or early spring. However, dead branches should be removed as soon as they are noticed. Care should be taken to avoid cutting off the central leader of a tree if one is present. If a tree is severely damaged or experiences more than 2/3 die back, it should be replaced in either the spring or fall planting season, whichever comes first. The only exception to this is if the replacement tree has a fall transplanting hazard. Replacement trees should be planted at the same size and condition as specified on the landscape plans. Any tree or shrub maintenance, tree pruning or plant material substitution of species or size shall be subject to the approval of the project Landscape Architect. c) Control of Weeds: Although a regular grass maintenance program will minimize weed intrusion, some weeds will appear. Periodic weeding, either chemically or mechanically, will help to maintain a healthy turf, and keep grassed areas looking attractive. Application of chemicals should be minimized and monitored closely so as not to affect the ecosystems within the pervious pavement system. Excessive growth of weeds within the system can be controlled mechanically as discussed in the previous section. The recording of all maintenance work and inspections provide valuable data on the facility’s condition. Review of this information will also help to establish more efficient and beneficial maintenance procedures and practices. As the owner is ultimately responsible for site maintenance, all recorded information should be directed to the owner of the pervious pavement system for review and subsequent follow-up on recommendations. Data obtained from informal inspections should be retained; however, under current regulations, this data does not have to be submitted to NJDEP. 9
File revisions (1)
- Sep 29, 2026
e54c2899fd0b651,370 bytes