Supporting Documentation · Jan 7, 2026
111225_PB 25 10_457 Mount Pleasant Ave_Completeness Review
afe97fb4f9e03846911c59f47d5545e738e4fef4859aea8bbc9389219b3b16d7Indexed text · page 2
Show all pagesMemorandum Page 2 of 3 236 BROAD STREET, RED BANK, NJ 07701 • TEL 732.741.2900 • FAX 732.741.2929 • MAIL@HGAPA.COM • www.HGAPA.com • Package of Existing & Proposed Easements or Dedications; • Soil Removal Permit Application, dated September 17, 2025; • Application for a Tree Removal and Replacement Permit, DATED August 26, 2025; • 26-sheet Traffic Statement prepared by TPD Inc., dated September 19, 2025; • Stormwater Management Report prepared by Bohler Engineering NJ LLC., dated August 2025; • Stormwater Management Facilities Operations and Maintenance Manual, prepared by Bohler Engineering NJ LLC., dated August 2025; • 19-sheet Preliminary and Final Major Site Plan set prepared by Bohler Engineering NJ LLC., dated July 25, 2025, and revised through September 17, 2015; • Property Survey of Block 157, Lot 5 within the Township of West Orange, prepared by Control Point Associates, Inc., dated November 20, 2023, and revised through August 5, 2025; and • 5-sheet Architectural Plan set prepared by Jeffrey Taylor Architects, dated September 9, 2025. The planning staff has determined that the application is capable of being deemed complete, provided the following outstanding items are addressed: § 25-51.2 Administrative Requirements. e. Site inspection authorization form. • Not submitted, and a waiver has not been requested. The form shall be submitted prior to the Planning Board hearing for the application. f. Compliance with legal notice requirements. • We defer comment to the Planning Board attorney. i. Copies of approvals of other government/agencies as may be required or an affidavit indicating that application has been made to such agencies. • A list of required regulatory approvals and permits has been submitted. However, copies of the Soil Erosion and Sediment Control Plan Certification (issued September 30, 2025) and Letter of No Interest from the New Jersey Department of Transportation (issued September 18, 2025) have not been submitted. A copy of approvals shall be submitted prior to the Planning Board hearing for the application.
File revisions (1)
- Sep 29, 2026
afe97fb4f9e0153,017 bytes