Supporting Documentation · Jan 7, 2026
111225_PB 25 10_457 Mount Pleasant Ave_Completeness Review
afe97fb4f9e03846911c59f47d5545e738e4fef4859aea8bbc9389219b3b16d7Indexed text · page 3
Show all pagesMemorandum Page 3 of 3 236 BROAD STREET, RED BANK, NJ 07701 • TEL 732.741.2900 • FAX 732.741.2929 • MAIL@HGAPA.COM • www.HGAPA.com § 25-51.7.1 Major Site Plan Requirements - Preliminary Stage. a. Basic Data. 9. Name of individual preparing the site plan together with an embossed engineer's or architect's seal, applicable signature and license number. • The professional engineer’s and land surveyor’s license numbers are provided on the sheets, but their respective seals and signatures are not provided. These drawings shall be submitted prior to the Planning Board hearing for the application. c. Grading, Landscaping and Environmental Data. 10. Environmental impact study. • Not provided, and a waiver has not been requested. We defer additional comment regarding this requirement to the Board Engineer. § 25-51.7.2 Major Site Plan Requirements - Final Stage. a. Verification that all of the conditions of the preliminary approval have been met. • To be provided upon the completion of all preliminary approval conditions. f. Four copies of a map, referred to as a "Run Card", depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one inch equaling 400 feet, and contained on an 8 1/2 inch by eleven-inch paper within an area not to exceed 7 1/2 inches in width and eight inches in height. • Not provided, and a waiver has not been requested. We defer additional comment regarding this requirement to the Board Engineer.
File revisions (1)
- Sep 29, 2026
afe97fb4f9e0153,017 bytes