Supporting Documentation · Dec 3, 2025
Letter Blue Violet Response 2025 11 21
16611533384d3a776e35046041687b3bf007db635573e0a1cede1a915139cbb6Indexed text · page 1
Show all pagesMunicipal/Civil Engineering Golden & Moran Engineering Land Surveying JGoldenPE@gmail.com Site Plan Development (973) 714-2131 Septic System Design 6 Carey Avenue Environmental Services Butler, NJ 07405 November 21, 2025 Jamilet Baquerizo Vite Planning Board Secretary Township of West Orange 66 Main Street, West Orange New Jersey 07052 Re: Engineering/Planning Review Conditional Use Approval 76 Ashland Avenue Block 62, Lot 22.01 WOPB# No. PB 25-04 Dear Ms. Vite: We are in receipt of the Engineering Review Letter prepared by Matrix New World Engineering dated August 22, 2025 and the Township’s Planner Review letter prepared by Heyer, Gruel Associates dated November 10, 2025. Please consider the following responses to items relating to the revised engineering plans revised through November 21, 2025: 1.1 – The application is amended to include lots along Park Avenue known as Block 62, Lots 32 and 34. 1.2 – Incorporate conditions of approval remaining from the previous “Yerr Canna” application. 1) Items 1 through 8 for information purposes and do not require plan modifications. 9) Generators are shown for Blue Violet’s and Yerr Canna’s building. Both generators will meet current code requirements and will make application for an NJDEP Air Quality permit as may be required. 10) For information purposes and do not require plan modifications. 11) One electric charging station is shown, The specific design specifications to be provided by the manufacturer in accordance with ordinance/State code requirements. The EV charging station shall be active prior to receiving a Certificate of Occupation for the Blue Violet facility. 12) Additional lighting standards provided throughout the facility. The majority of the site meets the required 1.0 fc requirement. However certain isolated locations maintain a minimum 0.5 fc intensity. These isolated areas do not present a health or safety concern since these areas are not typically accessed after hours. The applicant’s intent is to provide adequate lighting without contributing to any perceived excessive light pollution. 13) The entire parking lot, originally identified as “asphalt” in the Arna Engineering Review letter, shall be milled and or reconstructed to meet original grade. The entire parking lot will be constructed with a full depth parking lot pavement section.
File revisions (1)
- Sep 29, 2026
16611533384d148,499 bytes