Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

251203_42 ERW_Stormwater Report

Preserved file SHA-25667175cb2f3756fe888e009234701a4adac3e9c1456a51d2343547cb82e5fd763

Indexed text · page 189

Show all pages
Page 189

PROJECT: 42 Eagle Ridge Way LOCATION: West Orange, NJ PROJECT NO. 24006174A GROUNDWATER: First Encountered DEPTH (ft) DATE N.E. 08/28/25 DEPTH (ft.) 0 +/-613 Survey GROUND ELEVATION (ft): ELEV. FROM: GROUNDWATER ELEV. (ft): EQUIPMENT: Mini Excavator FIELD OBSERVER: FSD CHECKED BY: DP DATE STARTED 08/28/25 DATE FINISHED 08/28/25 DESCRIPTION 10YR 3/3 Silt Loam, 20% coarse fragments, subangular blocky, friable. (moist) 54" 6.5 PAGE 1 OF 1 CONTRACTOR: Grabowski Construction, Inc. WATER SYMBOL At Completion (0 hrs.) TEST PIT: TP-101 72" -6 5YR 4/6 Silt Clay Loam, 20% coarse fragments, subangular blocky, friable. (moist) END OF TEST PIT AT 72 INCHES END OF TEST PIT AT 6 FT DUE TO REFUSAL ON BEDROCK 13 19.5 26 32.5 39 NOTES: Infiltration test performed at 3 ft below existing grades. Backfilled with soil cuttings upon completion. Perched Water Conditions - Not Encountered Est. Seasonal High Groundwater - Not Detected TEST PIT: TP-101 PAGE 1 OF 1

File revisions (1)