Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

251203_42 ERW_Stormwater Report

Preserved file SHA-25667175cb2f3756fe888e009234701a4adac3e9c1456a51d2343547cb82e5fd763

Indexed text · page 7

Show all pages
Page 7

As shown in the above table, the proposed development is designed to maintain 100 percent of the average annual pre-construction groundwater recharge volume for the site. Conclusion As discussed above, water quantity mitigation is provided for all watersheds for all storm events studied in accordance with NJDEP and Township of West Orange regulations. A subsurface infiltration basin was utilized to achieve the required reductions for all Design Points. Furthermore, water quality treatment is not required for this project site. As such, there should be no adverse impacts due to stormwater, on-site or off-site, as a result of the proposed development. Included in the appendix of this report is the HydroCAD output for back-up on both the existing and proposed conditions. Additionally, the aforementioned Existing and Proposed Drainage Area Maps, an Inlet Area Map, Pipe Capacity Report, and Scour Hole Sizing Calculations are provided in the appendix of this report. Stormwater Management Report | October 18, 2024 – Last Revised December 3, 2025 Page 5

File revisions (1)