Supporting Documentation · Dec 18, 2025
2025 12 04 TIS Rev 4
baa476468fca674cae0d03d4be88aad017ab36ed4766db9567a90c572397de59Indexed text · page 103
Show all pages1021-99-025T Build - AM - MIT. 50: Prospect Avenue & Eagle Rock Avenue (CR 611) Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Approach Delay (s/veh) 56.5 64.4 70.6 81.4 Approach LOS E E E F Queue Length 50th (ft) 210 47 552 488 193 ~486 ~559 51 ~435 Queue Length 95th (ft) 276 167 #821 #600 #310 #627 #816 99 #577 Internal Link Dist (ft) 241 655 513 302 Turn Bay Length (ft) 400 135 150 Base Capacity (vph) 520 441 561 1118 277 991 700 252 840 Starvation Cap Reductn 47 36 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.86 0.65 0.98 0.89 0.75 0.90 1.06 0.23 1.00 Intersection Summary Area Type: Other Cycle Length: 140 Actuated Cycle Length: 140 Offset: 0 (0%), Referenced to phase 2:NBT and 6:SBT, Start of Green Natural Cycle: 150 Control Type: Actuated-Coordinated Maximum v/c Ratio: 1.06 Intersection Signal Delay (s/veh): 68.7 Intersection LOS: E Intersection Capacity Utilization 116.7% ICU Level of Service H Analysis Period (min) 15 ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane.
is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. dl Defacto Left Lane. Recode with 1 though lane as a left lane. Splits and Phases: 50: Prospect Avenue & Eagle Rock Avenue (CR 611) CJM Synchro 12 Report 12/04/2025 Lanes, Volumes, Timings
File revisions (1)
- Sep 29, 2026
baa476468fca10,080,586 bytes