Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

2025 12 04 TIS Rev 4

Preserved file SHA-256baa476468fca674cae0d03d4be88aad017ab36ed4766db9567a90c572397de59

Indexed text · page 88

Show all pages
Page 88

1021-99-025T Existing - AM 50: Prospect Avenue & Eagle Rock Avenue (CR 611) Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 46 315 230 1035 332 76 181 834 700 55 736 47 Future Volume (vph) 46 315 230 1035 332 76 181 834 700 55 736 47 Ideal Flow (vphpl) 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 2100 Lane Width (ft) 11 11 11 11 11 11 11 11 11 11 11 11 Grade (%) 6% -3% -3% 4% Storage Length (ft) 0 0 400 0 0 135 150 0 Storage Lanes 0 1 1 0 1 1 1 0 Taper Length (ft) 25 250 25 70 Lane Util. Factor 0.95 0.95 1.00 0.91 0.91 0.95 1.00 0.95 1.00 1.00 0.95 0.95 Frt 0.850 0.988 0.850 0.991 Flt Protected 0.994 0.950 0.973 0.950 0.950 Satd. Flow (prot) 0 3467 1609 1746 3464 0 1847 3693 1684 1766 3635 0 Flt Permitted 0.994 0.950 0.973 0.950 0.950 Satd. Flow (perm) 0 3467 1609 1746 3464 0 1847 3693 1684 1766 3635 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 231 7 340 4 Link Speed (mph) 35 35 35

Page 88

231 7 340 4 Link Speed (mph) 35 35 35 35 Link Distance (ft) 321 735 593 382 Travel Time (s) 6.3 14.3 11.6 7.4 Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Heavy Vehicles (%) 9% 7% 4% 2% 5% 14% 6% 6% 4% 7% 3% 4% Shared Lane Traffic (%) 50% Lane Group Flow (vph) 0 368 235 528 945 0 185 851 714 56 799 0 Turn Type Split NA Perm Split NA Prot NA Perm Prot NA Protected Phases 8 8 4 4 5 2 1 6 Permitted Phases 8 2 Detector Phase 8 8 8 4 4 5 2 2 1 6 Switch Phase Minimum Initial (s) 19.0 19.0 19.0 47.0 47.0 20.0 32.0 32.0 20.0 32.0 Minimum Split (s) 25.0 25.0 25.0 53.0 53.0 24.0 38.0 38.0 24.0 38.0 Total Split (s) 25.0 25.0 25.0 53.0 53.0 24.0 38.0 38.0 24.0 38.0 Total Split (%) 17.9% 17.9% 17.9% 37.9% 37.9% 17.1% 27.1% 27.1% 17.1% 27.1% Maximum Green (s) 19.0 19.0 19.0 47.0 47.0 20.0 32.0 32.0 20.0 32.0 Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 1.0 2.0 2.0 1.0 2.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 Lead/Lag

Page 88

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 6.0 6.0 4.0 6.0 6.0 4.0 6.0 Lead/Lag Lead Lag Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Vehicle Extension (s) 2.0 2.0 2.0 2.0 2.0 2.0 0.2 0.2 2.0 0.2 Recall Mode None None None None None None C-Max C-Max None C-Max Act Effct Green (s) 19.0 19.0 47.0 47.0 20.0 36.8 36.8 20.0 32.0 Actuated g/C Ratio 0.14 0.14 0.34 0.34 0.14 0.26 0.26 0.14 0.23 v/c Ratio 0.78 0.56 0.90 0.86dl 0.70 0.88 1.03 0.22 0.96 Control Delay (s/veh) 74.7 21.8 64.2 48.7 72.4 61.5 69.0 55.7 75.6 Queue Delay 0.0 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 74.7 22.3 64.2 48.7 72.4 61.5 69.0 55.7 75.6 LOS E C E D E E E E E CJM Synchro 12 Report 12/02/2025 Lanes, Volumes, Timings

File revisions (1)