Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

2025 12 08_West Orange SMP Memorandum

Preserved file SHA-2569bfb8d27290970ec97f1547a5509fa074ed5cd761209e6e77a5acf262b5d3735

Indexed text · page 8

Show all pages
Page 8

Stormwater Management Plan Memorandum 3.0 Revision A Soil Erosion and Sediment Control Measures SOIL EROSION AND SEDIMENT CONTROL MEASURES A soil erosion and sediment control plan and associated details have been developed to control sediment during construction activities. Silt sock and/or silt fence will be installed around the perimeter of the areas to be disturbed prior to beginning construction. Newly graded areas will be stabilized with erosion control blanket during construction, and the project entrance will be stabilized with 1.5” to 2.5” stone tracking pads. Filter protection will be provided at existing and proposed inlets to minimize sediment from entering the subsurface storm drainage system. Upon completion of earthwork activities, the station yard within the fenced area will be rocked with a sacrificial rock working surface to temporarily stabilize the site. Public Service Electric & Gas Company TOC-3-1 Burns & McDonnell

File revisions (1)