2025 12 08_West Orange SMP Memorandum
9bfb8d27290970ec97f1547a5509fa074ed5cd761209e6e77a5acf262b5d3735Indexed text · page 9
Show all pagesStormwater Management Plan Memorandum 4.0 Revision A Conclusions CONCLUSIONS Because this project disturbs more than one acre, it is classified as a Major Development. However, as it is located within an urban redevelopment area, the project is not required to provide groundwater recharge. The underground detention basin system will address the stormwater quantity requirements while the grass swale addresses stormwater quality. Eventually, the treated stormwater is to be released into the existing municipal storm drain infrastructure, located within Mount Pleasant Avenue. There is no anticipated adverse impact to the public or private lands adjacent to the site. Temporary on-site erosion control measures have been designed in accordance with the New Jersey Department of Environmental Protection’s standards set forth in the New Jersey Stormwater BMP Manual and the New Jersey Department of Agriculture’s Standards for Soil Erosion and Sediment Control. Public Service Electric & Gas Company TOC-4-1 Burns & McDonnell
File revisions (1)
- Sep 29, 2026
9bfb8d2729094,564,502 bytes