Show all pagesChairman and Members of the West Orange Township Zoning Board December 12, 2025 Re: PSE&G Company (ZB-24-06) Our File No. 115.WRZ0155.V04 Preliminary & Final Site Plan with ‘C’ and ‘D’ Page 2 Variances and Tree Removal Permit - Review #3 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\115.WRZ0155.V04 - PSE&G Company\2025-12-12 - Review #3.docx • A Conceptual Tree Removal Memo prepared by Paulus, Sokolowski and Sartor, LLC dated December 8, 2025, detailing the 47 trees previously noted for removal that are now proposed to remain. • A December 8, 2025 submission letter to the Township of West Orange Zoning Board from Noreen Merainer, AICP, PP, PMP describing the revisions to the application. In addition to the above, our office previously received the following information as part of the previous submissions for this application: • A set of Site Plan drawings (3 sheets) prepared by Michael J. Blake, PE with Burns & McDonnell Engineering Company, Inc. and Michael D. Ragsdale, PLS with PSEG Services Corporation dated May 2, 2024. • A set of unsigned West Orange Switching Station plans (16 sheets) prepared by Jonathan M. Copa, PE and Michael J. Blake, PE with Burns & McDonnell Engineering Company, Inc. dated March 20, 2023. • A set of Boundary and Topographic Survey plans (3 sheets) prepared by Michael D. Ragsdale, PLS dated May 2, 2024. • A set of Tree Removal Plans (3 sheets) prepared by John R. Futey II, LLA with Paulus, Sokolowski and Sartor, LLC and bearing a latest revision date of August 11, 2024. • A set of Landscape Plans (2 sheets) prepared by John R. Futey II, LLA and bearing a latest revision date of August 11, 2024. • A print of an unsigned Landscape Rendering (1 sheet) prepared by John R. Futey II, LLA and bearing a latest revision date of August 18, 2024. • An Environmental Impact Memorandum dated August 29, 2024. • A report entitled “Requirements for Variances and Reasons for Relief Statement” prepared by Noreen Merainer, PP, PMP with Public Service Electric and Gas Company dated May 10, 2024. • A report entitled “Stormwater Management Plan” prepared by Michael J. Blake, PE dated May 9, 2024. • A report entitled “Stormwater Management Measures Maintenance Plan and Field Manuals” prepared by Michael J. Blake, PE and dated April 30, 2024. Included in the report are the following documents: o A Supplemental Test Pits and Permeability Testing Report
enance Plan and Field Manuals” prepared by Michael J. Blake, PE and dated April 30, 2024. Included in the report are the following documents: o A Supplemental Test Pits and Permeability Testing Report prepared by Christopher McLaughlin, PE with GZA GeoEnvironmental, Inc. of South Bound Brook, New Jersey and dated January 17, 2023 o A Subsurface Investigation Report prepared by Christopher McLaughlin, PE dated August 8, 2022.
File revisions (1)
- Sep 29, 2026
0cdb7a7c7ffc350,392 bytes