Supporting Documentation · Dec 18, 2025
25 12 12 MPB Realty Planning Review 5
8a0080fb4dfc4e6b567905dceac61bd990bf4edcb47a2dc64464ffbaa774cfe0Indexed text · page 5
Show all pagesWest Orange Zoning Board December 12, 2025 Re: MPB Realty (Popeyes & IHOP) Our File No. WRZ0153.V01 Planning Review #5 Page 5 H:\Legacy\Howell-FS1\SEC\West Orange\WR VAULT\VWRZ0153.01 - MPB Realty LLC\25-12-12 MPB Realty - Planning Review 5.docx 4. Materials Submitted The following materials have been submitted and reviewed in association with this application: • Application form and submission checklists dated July 1, 2024; • Two (2) page application cover letter from Jason Tuvel, Esq. dated August 12, 2024; • Twenty-one (21) sheet set of site plan drawings prepared by Dynamic Engineering, dated June 7, 2024, last revised November 25, 2025; • Two (2) sheet set of architectural drawings prepared by G 141 Architecture, dated June 12, 2024; • Acoustical Evaluation report, prepared by Lewis S. Goodfriend & Associates, dated June 17, 2024, revised February 3, 2025; • Drainage statement for subject property, prepared by Dynamic Engineering, dated June 2024; • Environmental Impact Statement, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Stormwater Management Operation and Maintenance Manual, prepared by Dynamic Engineering, dated June 2024; • Traffic Impact Study, prepared by Dynamic Traffic, dated October 21, 2022, last revised December 5, 2025; • Variance & Waiver Request List, prepared by Dynamic Engineering, dated June 7, 2024; • Planning Report and Justification for Variances, prepared by Dresdner Robin, dated August 2, 2024, revised to September 5, 2025; • Tree Removal Report, prepared by Dynamic Engineering, dated June 2024, revised February 2025; • Solid Waste Management Plan, prepared by Dynamic Engineering, dated June 7, 2024; • Copy of Resolution PB-97-18, dated October 8, 1997; • Copy of Resolution dismissing previous application without prejudice, dated March 21, 2024; • One (1) sheet survey drawing prepared by Dynamic Survey, LLC, dated May 13, 2021 • Eight (8) page response letter prepared by Dynamic Engineering, dated September 8, 2025; • One (1) sheet sustainability checklist report; • One (1) page Rooftop Mechanical and Equipment Acoustical response letter prepared by Lewis S. Goodfriend & Associates, dated October 8th, 2025.
File revisions (1)
- Sep 29, 2026
8a0080fb4dfc290,683 bytes