Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

2025 12 16_ZB 24 15_42 Eagle Ridge Way_Engineering Review 3

Preserved file SHA-25640d87bbb39a1a157632d329b988290abae08742992c80c38d19dbefe06b79df8

Indexed text · page 2

Show all pages
Page 2

F:\2023\23-1345 West Orange 2024 Municipal Engineering Services\010 - ZB-24-15, Waystone Realty - 42 Eagle Ridge Way\Correspondence\Letters\2025-12-16_ZB-24-15_42 Eagle Ridge Way_Engineering Review 3.Docx 2 ▪ Signed but unsealed set of engineering drawings, prepared by Colliers Engineering & Design, Inc., dated October 18, 2024, and revised through December 3, 2025 including the following sheets: • Cover Sheet (Sheet 1) • Demolition Plan (Sheet 2) • Layout Plan (Sheet 3) • Grading and Drainage Plan (Sheet 4) • Utility Plan (Sheet 5) • Landscape Plan (Sheet 6) • Soil Erosion & Sediment Control Plan (Sheet 7) • Construction Details -1 (Sheet 8) • Construction Details – 2 (Sheet 9) PROJECT DESCRIPTION Matrix understands that the Owner and Applicant for this application is Waystone Realty, LLC, mailing address: 40 Eagle Ridge Way, West Orange, New Jersey. Per the Township’s Zoning Map (last revised 2020), the subject parcel is commonly known as 42 Eagle Ridge Way (Block 106, Lot 24.01) is located in the ‘R-1’ (Residential, 80,000 square foot minimum area) zoning district along Eagle Ridge Way, approximately 600 feet from the intersection of Eagle Ridge Way and Boland Drive. The subject property is approximately 3.09 acres and is presently undeveloped. It was previously improved with a single- family house which was razed. Since the house was demolished, the property has been disturbed as part of the improvements associated with 40 Eagle Ridge Way. The improvements there now are pending a Planning Board approval for a pool house, an inground pool and the disturbance of over one acre of property. Some of the disturbed property associated with the construction at 40 Eagle Ridge Way occurred on the parcel which is the subject of this application. The disturbance of greater than one acre classified the project at 40 Eagle Ridge Way as a Major Site Plan under the Township’s Stormwater Management Regulations. Below is a summary of the proposed property improvements. The proposed development consists of a single-family house, a barn for keeping horses and an indoor arena. There will also be an outdoor arena, grass paddocks, landscape areas, driveways and pathways. Stormwater management facilities are also proposed. Approximately 3.13 acres of land will be disturbed which includes all 3.09 acres of Block 106, Lot 24.01 (42 Eagle Ridge Way) to accommodate the previously

Page 2

ter management facilities are also proposed. Approximately 3.13 acres of land will be disturbed which includes all 3.09 acres of Block 106, Lot 24.01 (42 Eagle Ridge Way) to accommodate the previously mentioned proposed improvements. Since more than one acre of land is being disturbed for these improvements, this application is considered a Major Site Plan under the Township’s Storm Water Management regulations. This parcel was previously disturbed as part of the construction associated with 40 Eagle Ridge Way. Currently there is a stormwater management plan for 40 Eagle Ridge Way approved by the West Orange Planning Board. That plan does not consider the disturbance at 42 Eagle Ridge Way. Should this plan not be approved the Storm Water Management Plan for 40 Eagle Ridge Way must be revised. The engineering drawings do not depict any trees to be removed as any trees disturbed by the construction were previously removed and a permit was issued by the Township Forester. The applicant submitted a Landscape Plan that depicts new proposed plantings. 1. General 1.1. Architectural drawings were provided as part of the submission. It appears that the proposed buildings comply with the residential building design criteria specified in Ordinance §25-9.7(b). 1.2. A property boundary and topographic survey was submitted. It was prepared by Kiersten Osterkorn, P.E., P.L.S. of Omland and Osterkorn, dated May 22, 2024. This survey may need to be updated to reflect any recent ground disturbance.

File revisions (1)