2025 12 16_ZB 24 15_42 Eagle Ridge Way_Engineering Review 3
Preserved file SHA-256
40d87bbb39a1a157632d329b988290abae08742992c80c38d19dbefe06b79df8Indexed text · page 5
Show all pagesF:\2023\23-1345 West Orange 2024 Municipal Engineering Services\010 - ZB-24-15, Waystone Realty - 42 Eagle Ridge Way\Correspondence\Letters\2025-12-16_ZB-24-15_42 Eagle Ridge Way_Engineering Review 3.Docx 5 7. Other 7.1. The Engineer shall prepare a Site Improvement cost estimate for the purpose of determining the amount for an escrow account for site inspections. Thank you for the opportunity to be of service to the Township of West Orange Zoning Board of Adjustment. Please feel free to contact me directly with any questions or comments at (973) 703-5989 or via email at llepore@mnwe.com. Sincerely, Leonard Lepore Leonard R. Lepore, P.E. Project Engineer LL:lb Copy to: Dennis Petrocelli, PG – Matrix