Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 18, 2025

25 12 16 Waystone CME Planning Review 1

Preserved file SHA-256855e5b46ac0529d96651347b8e6a2188723b2e574a0393671dcd9496c2cd08f9

Indexed text · page 5

Show all pages
Page 5

West Orange Zoning Board December 16, 2025 Re: 42 Eagle Ridge Way – Waystone Realty LLC Our File No. 115.WRZ0106.V01 CME Planning Review #1 Page 5 H:\Legacy\Howell-FS1\SEC\West Orange\Zoning Board\Waystone Realty - 42 Eagle Ridge Way\25-12-16 Waystone - CME Planning Review 1.docx 6. Materials Submitted The following materials have been submitted and reviewed in association with this application: • Nine (9) sheet set of site plan drawings, prepared by Colliers Engineering & Design, dated October 18, 2024, last revised December 3, 2025; • Stormwater Management Report, prepared by Colliers Engineering & Design, dated October 18, 2024, last revised December 3, 2025; • One (1) page letter from O2Compost Systems regarding spontaneous combustion, undated;

File revisions (1)