Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 7, 2026

05 Response to Technical Review Comments 12 17 2025

Preserved file SHA-256cd5208feb4a6faaea855d7269d7ec4f93476b93fa451b61cfea6f28361a48ade

Indexed text · page 1

Show all pages
Page 1

30 Independence Blvd., Suite 200 Warren, NJ 07059 908.668.8300 www.BohlerEngineering.com December 17, 2025 Via Federal Express Ms. Jamilet Baquerizo Vite Planning Board Secretary Township of West Orange 66 Main Street West Orange, NJ 07052 RE: Township Resubmission Proposed Retail Store 457 Mt. Pleasant Avenue Block 157, Lot 5 Township of West Orange Essex County, New Jersey BENJ File No. NJA230139 Dear Ms. Vite: Enclosed, please find the following documents in regard to our resubmission to the Township of West Orange for the above referenced project: • Five (5) signed and sealed copies of the Preliminary & Final Major Site Plan prepared Bohler Engineering NJ, LLC, dated August 14, 2025, last revised December 10, 2025; • Five (5) signed and sealed copies of the Stormwater Management Report, prepared by Bohler Engineering NJ, LLC, dated December 2025; • Five (5) signed copies of the Traffic Statement, prepared by TPD, Inc., dated September 19, 2025, last revised December 12, 2025; • Five (5) signed and sealed copies of the Site Traffic Control Plans, prepared by TPD, Inc., dated December 10, 2025; • Five (5) copies of the Opinion of Probable Construction Costs, prepared by Bohler Engineering NJ, LLC, dated August 14, 2025, last revised December 10, 2025; • Five (5) copies of the HEPSCD Certification, dated September 30, 2025; • Five (5) copies of the NJDOT Letter of No Interest, dated September 18, 2025. We are in receipt of the Completeness Review Memorandum prepared by Heyer, Gruel & Associates, dated November 12, 2025 and offer the following responses: § 25-51.2 Administrative Requirements. e. Site inspection authorization form. • Not submitted, and a waiver has not been requested. The form shall be submitted prior to the Planning Board hearing for the application. The "Township of West Orange Application for the Planning Board or Zoning Board of Adjustment" which the applicant submitted and which is signed by the applicant and the property owner, authorizes inspection of the site. Therefore, this item has been provided. f. Compliance with legal notice requirements. • We defer comment to the Planning Board attorney. Acknowledged.

File revisions (1)