Supporting Documentation · Jan 7, 2026
05 Response to Technical Review Comments 12 17 2025
cd5208feb4a6faaea855d7269d7ec4f93476b93fa451b61cfea6f28361a48adeIndexed text · page 13
Show all pageswww.BohlerEngineering.com Ms. Jamilet Baquerizo Vite Township of West Orange BENJ File No. NJA230139 December 16, 2025 Page 13 of 14 The Lighting Plan has been revised to depict replacement and/or supplemental lighting throughout the property, where existing lighting does not meet township requirements. The proposed site lighting throughout the property has been designed in accordance with the Township Ordinance §25-14.3 where allowable. A variance is requested to provide less than 2.0 footcandles throughout parking areas due to existing site constraints and maximum permitted mounting heights. 7. Landscaping and Buffers 7.1 The Applicant shall provide testimony regarding existing vegetation, and any related removals, replacements, or new planting areas. The Applicant shall also confirm the presence of required buffers as the property abuts residential zones. Testimony regarding the existing vegetation and related removals and replacement will be provided. A total off five (5) existing trees are proposed, three (3) are non-viable and two (2) are viable. To account for the five (5) total trees to be removed, fourteen (14) new replacement trees are proposed, in compliance with §28-8 Tree Replacement of the Township Ordinance. 8. Utilities 8.1 The Applicant shall provide testimony on utility service lines, laterals, connections, or associated appurtenances that are proposed for the new facilities. The Applicant shall clean and televise the existing sanitary lateral and any roof drainage laterals intended to be reused prior to construction. Acknowledged. Cleaning and CCTV inspection will be provided as a condition of approval. 8.2 The Applicant shall provide testimony regarding the need to construct any above- or below grade improvements for utility services. Acknowledged. Testimony regarding above- and below-grade improvements for utilities will be provided. 9. Traffic, Traffic Maintenance and Parking Maintenance 9.1 The Applicant shall provide a Traffic Maintenance and Parking Maintenance Plan depicting how traffic and circulation patterns and parking for those retail facilities that remain will be maintained during the constructions period. Acknowledged. A Traffic Control Plan has been prepared by TPD Inc. and enclosed within this submission. 9.2 Vehicle access, egress and turn restrictions shall remain as previously approved. Acknowledged. 9.3 There appears
ic Control Plan has been prepared by TPD Inc. and enclosed within this submission. 9.2 Vehicle access, egress and turn restrictions shall remain as previously approved. Acknowledged. 9.3 There appears to be a small inconsistency between the number of parking stalls on the Site Plan and the number of stalls specified in the traffic report. The number of physical parking stalls proposed is 184. Four (4) electric vehicles are permitted to count as double per the Township of West Orange EVSE Ordinance §25-12.6.e.2, bringing the total proposed parking stalls per ordinance to 188.
File revisions (1)
- Sep 29, 2026
cd5208feb4a6286,573 bytes