Supporting Documentation · Jan 7, 2026
05 Response to Technical Review Comments 12 17 2025
cd5208feb4a6faaea855d7269d7ec4f93476b93fa451b61cfea6f28361a48adeIndexed text · page 14
Show all pageswww.BohlerEngineering.com Ms. Jamilet Baquerizo Vite Township of West Orange BENJ File No. NJA230139 December 16, 2025 Page 14 of 14 10. Inspection Escrow 10.1 The Applicant shall prepare a construction cost estimate for the site improvements for the purpose of computing the amount of funds to be placed in escrow for site inspections. Acknowledged. An Opinion of Probable Construction Costs has been enclosed within this submission. We are in receipt of the Review Memorandum prepared by Walt Kipp, Township Forester, dated November 12, 2025 and offer the following responses: • 4 dead trees along the north side of the building in the rear lot need to be removed. • 2 dead trees on the northeast side of the building along the parking close to Mount Pleasant Place exit need to be removed. Sheets C-201 and L-101 have been revised to note that any existing dead trees located on the subject property are to be removed in coordination with the Township Forester. • Per Township ordinance 28-4e.8, the 50% required canopy coverage for parking lots does not appear to be met on the replanting plan. The Landscape Plan (sheet L-201) has been revised to include additional parking lot tree canopy coverage. A calculation of the required and proposed canopy coverage has also been provided in the Compliance Chart provided on sheet L-201. Should you have any questions or comments concerning this or any other matter, please do not hesitate to contact our office. Sincerely, BOHLER ENGINEERING NJ, LLC Doug Wolfe, P.E. Tung-To Lam, P.E. DW/rf G:\2023\NJA230139.00\Admin\Letters-OUT\Township 01.docx Enclosure(s)
File revisions (1)
- Sep 29, 2026
cd5208feb4a6286,573 bytes