Supporting Documentation · Jan 7, 2026
05 Response to Technical Review Comments 12 17 2025
cd5208feb4a6faaea855d7269d7ec4f93476b93fa451b61cfea6f28361a48adeIndexed text · page 2
Show all pageswww.BohlerEngineering.com Ms. Jamilet Baquerizo Vite Township of West Orange BENJ File No. NJA230139 December 16, 2025 Page 2 of 14 i. Copies of approvals of other government/agencies as may be required or an affidavit indicating that application has been made to such agencies. • A list of required regulatory approvals and permits has been submitted. However, copies of the Soil Erosion and Sediment Control Plan Certification (issued September 30, 2025) and Letter of No Interest from the New Jersey Department of Transportation (issued September 18, 2025) have not been submitted. A copy of approvals shall be submitted prior to the Planning Board hearing for the application. A copy of the Soil Erosion and Sediment Control Certification from the Hudson-Essex- Passaic Soil Conservation District and a copy of the Letter of No Interest from the New Jersey Department of Transportation have been enclosed within this submission. § 25-51.7.1 Major Site Plan Requirements - Preliminary Stage. a. Basic Data. 9. Name of individual preparing the site plan together with an embossed engineer's or architect's seal, applicable signature and license number. • The professional engineer’s and land surveyor’s license numbers are provided on the sheets, but their respective seals and signatures are not provided. These drawings shall be submitted prior to the Planning Board hearing for the application. The enclosed site plans have been signed & sealed by their respective preparers. c. Grading, Landscaping and Environmental Data. 10. Environmental impact study. • Not provided, and a waiver has not been requested. We defer additional comment regarding this requirement to the Board Engineer. Per the Township of West Orange Ordinance §25-13.3.b, applications consisting of five acres or more are required to submit an Environmental Impact Study. The proposed development’s lot area is 3.71 acres, falling under the threshold for requiring an Environmental Impact Study. § 25-51.7.2 Major Site Plan Requirements - Final Stage. a. Verification that all of the conditions of the preliminary approval have been met. • To be provided upon the completion of all preliminary approval conditions. Acknowledged. f. Four copies of a map, referred to as a "Run Card", depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one inch
dged. f. Four copies of a map, referred to as a "Run Card", depicting the location of all fire hydrants within the subject property, and depicting the surrounding streets, based on a scale of one inch equaling 400 feet, and contained on an 8 1/2 inch by eleven-inch paper within an area not to exceed 7 1/2 inches in width and eight inches in height. • Not provided, and a waiver has not been requested. We defer additional comment regarding this requirement to the Board Engineer. Acknowledged. A waiver is requested for this submission item. Existing and proposed fire hydrants have been labeled on the Utilities Plan.
File revisions (1)
- Sep 29, 2026
cd5208feb4a6286,573 bytes