Item No. Description Quantity Unit Unit Cost Total Cost Total for MISCELLANEOUS: 14,440.00$ 1. Trenching, 4' Depth, Conduit by Others 150.00 LF 6.00$ 900.00$ Total for ELECTRIC AND COMMUNICATIONS: 900.00$ SUBTOTAL: 761,664.75$ TOTAL: 761,664.75$ G:\2023\NJA230139.00\Admin\Cost Estimates-OPC\[2025.12.10 - Inspection Fee OPC.xlsx]OPCC ELECTRIC AND COMMUNICATIONS In the event the above conditions and assumptions are exceeded and further modifications or additional services are required, Bohler reserves the right to supplement this OPCC with additional services and scopes. Items and scope not included in the above OPCC include, but are not limited to: •Design development changes; •Schedule adjustments; •General administration changes (such as wage rates); •Differing site conditions (above ground and below) from those reasonably expected; •Third party requirements imposed during construction including, but not limited to, new permits; and The Firm and the Client recognize and affirm that to the extent the Client, or where applicable, the Owner, authorizes Bohler to perform only a narrow scope of services, this will impact and limit Bohler’s ability to provide the cost(s) described herein. The above-stated costs are opinions, only, should not be considered a formal or final construction estimate and should not be relied upon to determine actual costs to perform and complete the scope of the above-described services, Project and improvements. Please note also that this OPCC consists of a "snapshot in time" and the reliability of this OPCC will degrade over time. Bohler cannot and does not make any warranty, promise, guarantee or representation, either express or implied, that proposals, bids, project construction costs, or cost of the scope of work described in this OPCC will not vary significantly over time. PG 3 of 3 www.BohlerEngineering.com

File revisions (1)