Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jan 7, 2026

09 Stormwater Mgmt Report 122025

Preserved file SHA-256671005d8c0aeaab7a16315eaa245a42512090a6bf622a657aa6b07da423c2420

Indexed text · page 115

Show all pages
Page 115

NJ DEP 2-hr WQ Rainfall=1.25", P2=4.09" NJA230139 - REV 2 Prepared by Bohler Engineering, PC HydroCAD® 10.20-7a s/n 03478 © 2025 HydroCAD Software Solutions LLC Printed 12/11/2025 Page 12 Summary for Pond PP1: Pervious Pavement Inflow Area = 11,761 sf,100.00% Impervious, Inflow Depth = 1.03" for WQ event Inflow = 0.81 cfs @ 1.01 hrs, Volume= 1,014 cf Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routed to Link P1 : PDA 1A Routing by Dyn-Stor-Ind method, Time Span= 0.00-72.00 hrs, dt= 0.10 hrs / 9 Peak Elev= 366.95' @ 2.10 hrs Surf.Area= 8,538 sf Storage= 1,014 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume #1 Invert 366.65' Elevation (feet) 366.65 367.65 Avail.Storage 3,415 cf Surf.Area (sq-ft) 8,538 8,538 Device #1 Routing Primary Invert 365.50' #2 Device 1 366.95' Storage Description Custom Stage Data (Prismatic)Listed below (Recalc) 8,538 cf Overall x 40.0% Voids Inc.Store (cubic-feet) 0 8,538 Cum.Store (cubic-feet) 0 8,538 Outlet Devices 15.0" Round RCP_Round 15" L= 273.0' RCP, groove end projecting, Ke= 0.200 Inlet / Outlet Invert= 365.50' / 364.15' S= 0.0049 '/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean, Flow Area= 1.23 sf 4.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=366.65' TW=0.00' (Dynamic Tailwater) 1=RCP_Round 15" (Passes 0.00 cfs of 4.21 cfs potential flow) 2=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs)

File revisions (1)