Supporting Documentation · Jan 7, 2026
12 Site Plans 12 10 2025
8a0d01bab4db3eab712e2cdc7188c48f6dd672d5fc77c498cb3c5bcfd951d7beIndexed text · page 19
Show all pagesLE TO ENSURE THAT ALL LIGHTING IS INSTALLED PER THIS LIGHTING PLAN, INCLUDING THE LOCATION, ORIENTATION, SHIELDING, AND/OR ROTATED OPTICS ARE INSTALLED AS INDICATED ON THE PLAN IN ORDER TO ACHIEVE THE LIGHTING LEVELS DEPICTED ON THIS PLAN. EXISTING POLES AND FOUNDATIONS ARE NOT TO BE REUSED. 7. UPON OWNER'S ACCEPTANCE OF THE COMPLETED PROJECT, THE OWNER SHALL BE RESPONSIBLE FOR ALL MAINTENANCE, SERVICING, REPAIR AND INSPECTION OF THE LIGHTING SYSTEM AND ALL OF ITS COMPONENTS AND RELATED SYSTEMS. THE LUMINAIRES, LAMPS AND LENSES MUST BE REGULARLY INSPECTED/MAINTAINED TO ENSURE THAT THEY FUNCTION PROPERLY. THIS WORK SHOULD INCLUDE, BUT IS NOT LIMITED TO, VISUAL OBSERVATION, CLEANING OF LENSES, AND OTHER MAINTENANCE SPECIFIED BY THE MANUFACTURER. FAILURE TO FOLLOW THE ABOVE STEPS COULD RESULT IN IMPROPER LIGHT DISTRIBUTION AND FAILURE TO COMPLY WITH THE APPROVED DESIGN. 8. THE LIGHT LOSS FACTORS (LLF) DEPICTED IN THE LUMINAIRE SCHEDULE ON THIS PLAN ARE BASED ON DATA PROVIDED BY THE MANUFACTURER FOLLOWING IES LM-80-21 TESTING (OR MOST RECENT EDITION). THE LIGHT LEVELS DEPICTED ON THIS PLAN WERE CALCULATED BASED ON THE LLF LISTED IN THE LUMINAIRE SCHEDULE. 9. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE SUBMITTALS TO BOHLER FOR REVIEW AND APPROVAL. SUBSTITUTION REQUESTS MUST BE ACCOMPANIED BY A HORIZONTAL PHOTOMETRIC STUDY DEMONSTRATING THAT THE LUMINAIRE(S) IN QUESTION WILL MEET THE DESIGN INTENT OF THIS PLAN. SUBSTITUTION REQUESTS WITHOUT A PHOTOMETRIC STUDY WILL BE REJECTED. 10.LIGHT POLE FOUNDATIONS ARE SHOWN ON THE PLAN IN THE INTENDED LOCATION BASED ON THE LIGHTING CALCULATIONS, UNLESS OTHERWISE NOTED. LIGHT SYMBOLS ARE SHOWN LARGER THAN ACTUAL SIZE, HOWEVER FOUNDATION SIZE IS SHOWN AT ACTUAL SIZE. 11.EXISTING LIGHTING WAS NOT MODELED. NO CHANGES ARE PROPOSED FOR EXISTING LIGHTING, EXCEPT AS NOTED ON THIS PLAN. 12.EXISTING LIGHT LEVELS (SHOWN IN ITALICS) ALONG THE INGRESS/EGRESS DRIVEWAY FROM PLEASANT VALLEY WAY ARE BASED ON A FIELD STUDY CONDUCTED ON FRIDAY, SEPTEMBER 12TH, 2025. SITE CIVIL AND CONSULTING ENGINEERING LAND SURVEYING PROGRAM MANAGEMENT LANDSCAPE ARCHITECTURE SUSTAINABLE DESIGN PERMITTING SERVICES TRANSPORTATION SERVICES W SOU RAH TH BR WAY ANC RIVE H R PLACE BROO K E GENERAL LIGHTING NOTES: UNITS AVG MAX MIN AVG/MIN MAX/MIN OVERALL PARKING FC 3.59 14.1 0.5 7.18 28.20 PEDESTRIAN
NSPORTATION SERVICES W SOU RAH TH BR WAY ANC RIVE H R PLACE BROO K E GENERAL LIGHTING NOTES: UNITS AVG MAX MIN AVG/MIN MAX/MIN OVERALL PARKING FC 3.59 14.1 0.5 7.18 28.20 PEDESTRIAN AREAS FC 3.74 6.1 1.4 2.67 4.36 NORTHERN PROPERTY LINE FC 0.18 0.5 0.0 N.A. N.A. EASTERN PROPERTY LINE FC 0.11 0.3 0.0 N.A. N.A. SOUTHERN PROPERTY LINE FC 0.26 0.5 0.0 N.A. N.A. WESTERN PROPERTY LINE FC 0.17 0.5 0.0 N.A. N.A. STREETS FC 3.79 14.1 1.2 3.16 11.75 NJ CERT. OF AUTHORIZATION NO. 24GA28400600 & MH000122 T. LAM PROFESSIONAL ENGINEER NEW JERSEY LICENSE No. 47863 NEW YORK LICENSE No. 092942 CONNECTICUT LICENSE No. 30024 PENNSYLVANIA LICENSE No. 76746 SHEET TITLE: REFER TO DETAIL SHEET FOR LIGHT POLE SPECIFICATION & LIGHT POLE FOUNDATION DETAIL LIGHTING PLAN REFER TO NOTES AND REFERENCES SHEET FOR ADDITIONAL NOTES, REFERENCES AND SPECIFICATIONS. THIS PLAN TO BE UTILIZED FOR LIGHTING PURPOSES ONLY SHEET NUMBER: L-301 30 15 7.5 0 SCALE: 1" = 30' 30 REVISION 2 - 12/10/2025
File revisions (1)
- Sep 29, 2026
8a0d01bab4db34,293,501 bytes